My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2026-078
>
Meetings
>
2026
>
05. May
>
2026-05-05 10:00 AM - Commissioners' Agenda
>
R2026-078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2026 12:45:40 PM
Creation date
5/12/2026 12:44:08 PM
Metadata
Fields
Template:
Meeting
Date
5/5/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution to Adopt the Snoqualmie Pass Comprehensive Safety Action Plan
Order
8
Placement
Consent Agenda
Row ID
144005
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SR 906, Summit CentralArea <br />Reconfigure the roadway to ease congestion, incorporate <br />pedestrian walkways, and separate parking from through <br />traffic. <br />. Narrowing the width of the travelled way for <br />through traffic will provide traffic calming <br />and help limit speeds along the corridor. <br />' Access to the parking lane would be from the <br />north only (from Exit 53) and encourage drivers <br />to use Exit 54 to access l-90 upon leaving. <br />. Consider snow storage and plowing operations <br />in selection of roadway section. <br />Reduce the speed limit to reflect appropriate speeds for <br />the reconfigured roadway. <br />lmplement congestion warning signs approaching Summit <br />Central from either direction as part of a systemic <br />application of low-cost cou ntermeasures. <br />Corridor lmprovement <br />LIMIT <br />25,r .e <br />SR9o6,Westof Summit <br />Central to Yellowstone Road <br />Add a shared use path to provide non- <br />motorized transportation alternatives. <br />This aligns with the walkway and bicycle <br />lane proven safety countermeasures and <br />provides pedestrians and cyclists with <br />a dedicated space that reduces their <br />interactions with vehicles. <br />. Connect Summit Central to <br />Yellowstone Road (0.6 miles). <br />. Provide local non-motorized <br />trail connectivity between <br />Alpental and Lake Keechelus. <br />Corridor lmprovement <br />lnstall a re-painted crosswalk to provide <br />a crossing for pedestrians between <br />private parking lots and pedestrian <br />desfinations. <br />lnstall a Pedestrian Hybrid Beacon (PHB) <br />or other actuated pedestrian signal to <br />replace the existing crossing beacon and <br />provide additional advanced warning of <br />the crossing location. <br />lmplement pedestrian push buttons to <br />allow pedestrians to actively indicate the <br />need to cross the roadway. Signal timing <br />can be evaluated to minimize delays and <br />improve traffrc flow. <br />lnstall pedestrian lighting, pavement <br />markings, and signage to enhance the <br />visibility of the crosswalk. This will <br />show drivers where to stop to provide <br />sufhcient stopping distance. <br />Crossing Treatment <br />SummitCentral
The URL can be used to link to this page
Your browser does not support the video tag.