My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
G - Fully Executed
>
Meetings
>
2026
>
05. May
>
2026-05-05 10:00 AM - Commissioners' Agenda
>
G - Fully Executed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2026 12:38:45 PM
Creation date
5/12/2026 12:38:36 PM
Metadata
Fields
Template:
Meeting
Date
5/5/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution to Authorize the Chair's Signature on Task Order No. 3 with Ardurra Group, Inc. for the Hungry Junction Road Project
Order
7
Placement
Consent Agenda
Row ID
144005
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Transportation On-Call Ardurra Group, lnc. <br />Task?.Z: Update Files and Standards and Greate a new Sheet Set. Ardurra will <br />create a new sheet set for the Ardurra 60% design and transfer survey and design <br />documents over to the new design file. <br />Task 2.3 Weekly Meetings with the County (Up to 10 Total). Ardurra will coordinate <br />and lead up to 10 informal weekly meetings with the county during this task to get input <br />from the county on work to help inform design decisions for the new 60% design. <br />Task 2.4lndependently Re-Establish the 60% Design. Ardurra will independently re- <br />establish the 60% design using the county's 60% as a basis. The new iteration of the <br />60% design will verify the county's assumptions and design intent, check for new ways <br />to optimize the design, verify the extents of right of way challenges, and identify <br />solutions to be implemented in subsequent design submittals. <br />a <br />a <br />a <br />Task Specific Assumptions: <br />The county will perform all survey work and provide all survey files. lf additional survey <br />needs are identified, the county will perform that work. <br />The county will provide the 60% design and supporting documentation. <br />The county will attend regular meetings and provide design feedback. <br />No Ardurra survey work is included in this scope. <br />See assumptions and exclusions below. <br />Deliverables <br />Meeting agendas and notes <br />New 60% Review Plans and Construction Cost Estimate <br />Task 3.0 Design <br />Ardurra will progress through multiple design iterations with the ultimate goal of delivering bid <br />ready plans, specifications, and estimate (PS&E) <br />Consultant Responsibilities <br />Task 3.1 - 90% Desiqn <br />Task 3.1.1 lncorporate Final 60% Design Gomments. Ardurra will respond to final <br />comments provided by the county on the 60% Review Submittal. <br />Task 3.1 .2.90% Plans. Ardurra will develop 90% design level plans <br />Task 3.1.3 90% Gost Estimate. Ardurra will develop 90% construction cost estimate <br />based on the design files. <br />a <br />a <br />a <br />a <br />a <br />a <br />a <br />a <br />Page 6 of 10
The URL can be used to link to this page
Your browser does not support the video tag.