My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
G - Fully Executed
>
Meetings
>
2026
>
05. May
>
2026-05-05 10:00 AM - Commissioners' Agenda
>
G - Fully Executed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2026 12:38:45 PM
Creation date
5/12/2026 12:38:36 PM
Metadata
Fields
Template:
Meeting
Date
5/5/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution to Authorize the Chair's Signature on Task Order No. 3 with Ardurra Group, Inc. for the Hungry Junction Road Project
Order
7
Placement
Consent Agenda
Row ID
144005
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Transportation On-Call Ardurra Group, Inc. <br />Task 3.1.4 Internat QC. Ardurra will provide an internal review of the draft 90% <br />submittal and update the deliverables before final submittal. <br />Task 3.1.5 Gontract and Specification Documents. Ardurra willdevelop the g0% <br />contract and specification package to accompany the 90% design deliverable. <br />Task 3.1.6 Submit for Review (PS&E). Ardurra will assemble and backcheck <br />documents and formally submit to the county for review. <br />Task 3.2 - 100% Desiqn <br />Task 3.2.1 lncorporate Final 90% Design Gomments. Ardurra will respond to final <br />comments provided by the county on the 90% Review Submittal. <br />Task 3.2.2. 100o/o Plans. Ardurra willdevelop 100% design <br />Task 3.2.3 l}Oo/o Cost Estimate. Ardurra will develop 1OO% construction cost estimate <br />based on the design files. <br />Task 3.2.4 lnternal QC. Ardurra will provide an internal review of the draft 100% <br />submittal and update the deliverables before finalsubmittal. <br />Task 3.2.5 Gontract and Specification Documents. Ardurra will develop the 100% <br />contract and specification package to accompany the 100% design deliverable. <br />Task 3.2.6 Submit for Review (PS&E). Ardurra will assemble and backcheck <br />documents and formally submit to the county for review. <br />Task 3.3 - Bid Documents <br />Task 3.3.1 lncorporate 100% Design Comments. Ardurra will respond to final <br />comments provided by the county on the 100% Review Submittal. <br />Task 3.3.2. Bid Document Plans. Ardurra will develop Bid Document design level <br />plans based on the previous design iteration. <br />Task 3.3.3 Bid Document Cost Estimate. Ardurra will develop Bid Document <br />construction cost estimate based on the design files. <br />Task 3.3.4 Internal QG. Ardurra will provide an internal review of the draft Bid <br />Document submittal and update the deliverables before final submittal. <br />a <br />a <br />a <br />a <br />a <br />a <br />a <br />a <br />a <br />a <br />a <br />a <br />Page 7 of 10
The URL can be used to link to this page
Your browser does not support the video tag.