My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_Snoqualmie Pass Comprehensive Safety Action Plan
>
Meetings
>
2026
>
05. May
>
2026-05-05 10:00 AM - Commissioners' Agenda
>
Resolution_Snoqualmie Pass Comprehensive Safety Action Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2026 12:25:25 PM
Creation date
4/30/2026 12:15:26 PM
Metadata
Fields
Template:
Meeting
Date
5/5/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution to Adopt the Snoqualmie Pass Comprehensive Safety Action Plan
Order
8
Placement
Consent Agenda
Row ID
144005
Type
Resolution
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HCM 7th TWSC <br />3: I-90 WB Off Ramp/I-90 WB On Ramp & Yellowstone Trail Rd 01/31/2025 <br />PM Weekend Future - October 2044 3:50 pm 01/07/2025 Baseline Synchro 12 Report <br />Page 3 <br />Intersection <br />Int Delay, s/veh 6.7 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 40 10 0 0 10 5 95 5 10 0 0 0 <br />Future Vol, veh/h 40100010595510000 <br />Conflicting Peds, #/hr000000000000 <br />Sign Control Free Free Free Free Free Free Stop Stop Stop Free Free Free <br />RT Channelized - - None - - None - - None - - None <br />Storage Length ------------ <br />Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - <br />Grade, % - 0 - - 0 - - 0 - - 0 - <br />Peak Hour Factor 75 75 75 75 75 75 98 98 98 83 83 83 <br />Heavy Vehicles, % 000000000000 <br />Mvmt Flow 53 13 0 0 13 7 97 5 10 0 0 0 <br />Major/Minor Major1 Major2 Minor1 <br />Conflicting Flow All 20 0 - - - 0 133 140 13 <br /> Stage 1 ------120120- <br /> Stage 2 ------1320- <br />Critical Hdwy 4.1-----6.46.56.2 <br />Critical Hdwy Stg 1 ------5.45.5- <br />Critical Hdwy Stg 2 ------5.45.5- <br />Follow-up Hdwy 2.2-----3.543.3 <br />Pot Cap-1 Maneuver 1609 - 0 0 - - 865 755 1073 <br /> Stage 1 - - 0 0 - - 910 800 - <br /> Stage 2 - - 0 0 - - 1015 883 - <br />Platoon blocked, %-- - <br />Mov Cap-1 Maneuver 1609 -----83601073 <br />Mov Cap-2 Maneuver ------8360- <br /> Stage 1 ------8800- <br /> Stage 2 ------1015 0 - <br />Approach EB WB NB <br />HCM Control Delay, s/v 5.85 0 8.4 <br />HCM LOS A <br />Minor Lane/Major Mvmt NBLn1 EBL EBT WBT WBR <br />Capacity (veh/h)1073 1440 - - - <br />HCM Lane V/C Ratio 0.014 0.033 - - - <br />HCM Control Delay (s/veh) 8.4 7.3 0 - - <br />HCM Lane LOS A A A - - <br />HCM 95th %tile Q(veh) 0 0.1 - - -
The URL can be used to link to this page
Your browser does not support the video tag.