My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_Snoqualmie Pass Comprehensive Safety Action Plan
>
Meetings
>
2026
>
05. May
>
2026-05-05 10:00 AM - Commissioners' Agenda
>
Resolution_Snoqualmie Pass Comprehensive Safety Action Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2026 12:25:25 PM
Creation date
4/30/2026 12:15:26 PM
Metadata
Fields
Template:
Meeting
Date
5/5/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution to Adopt the Snoqualmie Pass Comprehensive Safety Action Plan
Order
8
Placement
Consent Agenda
Row ID
144005
Type
Resolution
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HCM 7th TWSC <br />4: SR 906 & Tanner Way/Driveway 01/31/2025 <br />PM Weekend Future - October 2044 3:50 pm 01/07/2025 Baseline Synchro 12 Report <br />Page 4 <br />Intersection <br />Int Delay, s/veh 2.4 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 55555555055505 <br />Future Vol, veh/h 55555555055505 <br />Conflicting Peds, #/hr000000000000 <br />Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free <br />RT Channelized - - None - - None - - None - - None <br />Storage Length ------------ <br />Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - <br />Grade, % - 0 - - 0 - - 0 - - 0 - <br />Peak Hour Factor 75 75 75 75 75 75 75 75 75 75 75 75 <br />Heavy Vehicles, % 13 13 13 0 0 0 10 10 10 5 5 5 <br />Mvmt Flow 77777776777677 <br />Major/Minor Minor2 Minor1 Major1 Major2 <br />Conflicting Flow All 167 170 70 167 170 70 73 0 0 73 0 0 <br /> Stage 1 83 83 - 83 83 ------- <br /> Stage 2 83 87 - 83 87 ------- <br />Critical Hdwy 7.23 6.63 6.33 7.1 6.5 6.2 4.2 - - 4.15 - - <br />Critical Hdwy Stg 16.235.63-6.15.5------- <br />Critical Hdwy Stg 26.235.63-6.15.5------- <br />Follow-up Hdwy 3.617 4.117 3.417 3.5 4 3.3 2.29 - - 2.245 - - <br />Pot Cap-1 Maneuver 773 704 963 802 727 998 1477 - - 1508 - - <br /> Stage 1 898 805 - 930 830 ------- <br /> Stage 2 898 802 - 930 827 ------- <br />Platoon blocked, % - - - - <br />Mov Cap-1 Maneuver 754 697 963 782 720 998 1477 - - 1508 - - <br />Mov Cap-2 Maneuver 754 697 - 782 720 ------- <br /> Stage 1 894 801 - 925 826 ------- <br /> Stage 2 881 798 - 911 823 ------- <br />Approach EB WB NB SB <br />HCM Control Delay, s/v 9.68 9.51 0.62 0.62 <br />HCM LOS A A <br />Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1 SBL SBT SBR <br />Capacity (veh/h)147 - - 790 817 147 - - <br />HCM Lane V/C Ratio 0.005 - - 0.025 0.024 0.004 - - <br />HCM Control Delay (s/veh) 7.4 0 - 9.7 9.5 7.4 0 - <br />HCM Lane LOS A A -AAAA - <br />HCM 95th %tile Q(veh) 0 - - 0.1 0.1 0 - -
The URL can be used to link to this page
Your browser does not support the video tag.