Laserfiche WebLink
Transportation On -Call Ardurra Group, Inc. <br />• Task 2.2: Update Files and Standards and Create a new Sheet Set. Ardurra will <br />create a new sheet set for the Ardurra 60% design and transfer survey and design <br />documents over to the new design file. <br />• Task 2.3 Weekly Meetings with the County (Up to 10 Total). Ardurra will coordinate <br />and lead up to 10 informal weekly meetings with the county during this task to get input <br />from the county on work to help inform design decisions for the new 60% design. <br />Task 2.4 Independently Re -Establish the 60% Design. Ardurra will independently re- <br />establish the 60% design using the county's 60% as a basis. The new iteration of the <br />60% design will verify the county's assumptions and design intent, check for new ways <br />to optimize the design, verify the extents of right of way challenges, and identify <br />solutions to be implemented in subsequent design submittals. <br />Task Specific Assumptions: <br />• The county will perform all survey work and provide all survey files. If additional survey <br />needs are identified, the county will perform that work. <br />• The county will provide the 60% design and supporting documentation. <br />• The county will attend regular meetings and provide design feedback. <br />• No Ardurra survey work is included in this scope. <br />• See assumptions and exclusions below. <br />Deliverables: <br />• Meeting agendas and notes <br />• New 60% Review Plans and Construction Cost Estimate <br />Task 3.0 Design <br />Ardurra will progress through multiple design iterations with the ultimate goal of delivering bid <br />ready plans, specifications, and estimate (PS&E) <br />Consultant Responsibilities: <br />Task 3.1 — 90% Design <br />Task 3.1.1 Incorporate Final 60% Design Comments. Ardurra will respond to final <br />comments provided by the county on the 60% Review Submittal. <br />• Task 3.1.2. 90% Plans. Ardurra will develop 90% design level plans. <br />• Task 3.1.3 90% Cost Estimate. Ardurra will develop 90% construction cost estimate <br />based on the design files. <br />Page 6 of 10 <br />