Laserfiche WebLink
Transportation On -Call <br />Ardurra Group, Inc. <br />• Task 3.1.4 Internal QC. Ardurra will provide an internal review of the draft 90% <br />submittal and update the deliverables before final submittal. <br />• Task 3.1.5 Contract and Specification Documents. Ardurra will develop the 90% <br />contract and specification package to accompany the 90% design deliverable. <br />• Task 3.1.6 Submit for Review (PS&E). Ardurra will assemble and backcheck <br />documents and formally submit to the county for review. <br />Task 3.2 — 100% Design <br />• Task 3.2.1 Incorporate Final 90% Design Comments. Ardurra will respond to final <br />comments provided by the county on the 90% Review Submittal. <br />• Task 3.2.2. 100% Plans. Ardurra will develop 100% design. <br />• Task 3.2.3 100% Cost Estimate. Ardurra will develop 100% construction cost estimate <br />based on the design files. <br />• Task 3.2.4 Internal QC. Ardurra will provide an internal review of the draft 100% <br />submittal and update the deliverables before final submittal. <br />• Task 3.2.5 Contract and Specification Documents. Ardurra will develop the 100% <br />contract and specification package to accompany the 100% design deliverable. <br />• Task 3.2.6 Submit for Review (PS&E). Ardurra will assemble and backcheck <br />documents and formally submit to the county for review. <br />Task 3.3 — Bid Documents <br />• Task 3.3.1 Incorporate 100% Design Comments. Ardurra will respond to final <br />comments provided by the county on the 100% Review Submittal. <br />• Task 3.3.2. Bid Document Plans. Ardurra will develop Bid Document design level <br />plans based on the previous design iteration. <br />• Task 3.3.3 Bid Document Cost Estimate. Ardurra will develop Bid Document <br />construction cost estimate based on the design files. <br />• Task 3.3.4 Internal QC. Ardurra will provide an internal review of the draft Bid <br />Document submittal and update the deliverables before final submittal. <br />Page 7 of 10 <br />