My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-0206 Cle Elum Transfer Station Project Manual
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-0206 Cle Elum Transfer Station Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:38:37 PM
Creation date
4/2/2026 12:23:36 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Agreement for Services with Gibson and Son for the New Entrance and Tank Replacement at the Cle Elum Transfer Station
Order
4
Placement
Consent Agenda
Row ID
143218
Type
Agreement
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JOB NO: <br />DRAWING FILE NO: <br />DATE: <br />DESIGNER: <br />BY <br />DA <br />T <br />E <br />RE <br />V <br />I <br />S <br />I <br />O <br />N <br />S <br />DRAWN BY: <br />SH <br />E <br />E <br />T <br /> <br />T <br />I <br />T <br />L <br />E <br />: <br />OF <br />DRAWING NO: <br />SHEET NO: <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />N <br />A <br />M <br />E <br />: <br />SEAL: <br />APPROVED BY: <br />CL <br />E <br /> <br />E <br />L <br />U <br />M <br /> <br />T <br />R <br />A <br />N <br />S <br />F <br />E <br />R <br /> <br />S <br />T <br />A <br />T <br />I <br />O <br />N <br />CL <br />E <br /> <br />E <br />L <br />U <br />M <br />, <br /> <br />W <br />A <br /> <br />9 <br />8 <br />9 <br />2 <br />2 <br />JUNE 2025 <br />_22-000186 X-TLBK <br />17 <br />KI <br />T <br />T <br />I <br />T <br />A <br />S <br /> <br />C <br />O <br />U <br />N <br />T <br />Y <br />25 <br /> <br />N <br /> <br />W <br />E <br />N <br />A <br />T <br />C <br />H <br />E <br />E <br /> <br />A <br />V <br />E <br />, <br /> <br />S <br />U <br />I <br />T <br />E <br /> <br />2 <br />3 <br />8 <br />, <br /> <br /> <br />W <br />E <br />N <br />A <br />T <br />C <br />H <br />E <br />E <br />, <br /> <br />W <br />A <br /> <br />9 <br />8 <br />8 <br />0 <br />1 <br />P: <br /> <br />5 <br />0 <br />9 <br />. <br />8 <br />8 <br />6 <br />. <br />3 <br />2 <br />6 <br />5 <br />SC <br />J <br />A <br />L <br />L <br />I <br />A <br />N <br />C <br />E <br />. <br />C <br />O <br />M <br />--/--/---- <br />SEC. 21, T 20 N., R 15 E., W.M. <br />EX <br />I <br />S <br />T <br />I <br />N <br />G <br /> <br />C <br />O <br />N <br />D <br />I <br />T <br />I <br />O <br />N <br />S <br /> <br />A <br />N <br />D <br /> <br />RE <br />M <br />O <br />V <br />A <br />L <br /> <br />P <br />L <br />A <br />N <br />22-000186 RM-01 <br />RM-01 <br />J VERDUZCO <br />15 <br />K SHIFFLET <br />D IRELAND <br />AUGUST 2025 <br />DEMOLITION NOTES: <br />1. EXCAVATE AND REMOVE EXISTING 5,000 GALLON WW STORAGE <br />TANK. SEE EXISTING TANK DETAIL THIS SHEET. <br />2. CUT EXISTING 2" VENT PIPE AS NECESSARY FOR EXCAVATION. <br />PROTECT REMAINING PIPE FOR RE-USE. <br />3. CUT EXISTING 4" WW LINE AS NECESSARY FOR EXCAVATION. <br />PROTECT REMAINING PIPE FOR RE-USE. <br />4. REMOVE EXISTING CONDUIT AS NECESSARY FOR EXCAVATION <br />AND INSTALLATION OF NEW TANK. REMOVE ALL SENSOR WIRES <br />FOR REUSE. <br />5. EXISTING CONCRETE RETAINING WALL. TEMPORARY SHORING <br />REQUIRED PER SECTION 7-08.3(1)B OF THE WSDOT STANDARD <br />SPECIFICATIONS. <br />LEGEND: <br />EX. WASTE WATER TANK <br />EX. ELECTRICAL CONDUIT <br />EX. RETAINING WALL <br />SILT FENCE, SEE DETAIL SHEET DT-01 <br />INLET PROTECTION, SEE DETAIL SHEET <br />DT-01 <br />EXCAVATION BOUNDARY, 15' DEPTH AT <br />TANK <br />2 <br />3 <br />4 1 <br /># <br />SCALE IN FEET <br />0 20 40 <br />E <br />E <br />EROSION AND SEDIMENT CONTROL NOTES: <br />1. EROSION CONTROL MEASURES ARE NOT LIMITED TO THE ITEMS <br />ON THESE PLANS. THE CONTRACTOR IS RESPONSIBLE FOR THE <br />INSTALLATION AND MAINTENANCE OF ALL EROSION CONTOL <br />MEASURES. <br />2. EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO <br />THE BEGINNING OF CONSTRUCTION. <br />3. ALL EROSION/SEDIMENTATION CONTROL FACILITIES SHALL BE <br />MAINTAINED IN A SATISFACTORY CONDITION UNTIL CONSTRUCTION <br />IS COMPLETE AND THE SITE HAS BEEN STABILIZED. THE <br />CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTATION, <br />MAINTENANCE, REPLACEMENT, AND ADDITIONS TO THE SYSTEM AS <br />REQUIRED BY THE OWNER OR ENGINEER. <br />4. THE CONTRACTOR SHALL MAKE A DAILY SURVEILLANCE OF ALL <br />EROSION CONTROL MEASURES AND MAKE ANY NECESSARY <br />REPAIRS OR ADDITIONS TO THE EROSION CONTROL MEASURES AS <br />REQUIRED. <br />5. ANY STORM DRAINAGE INLETS RECEIVING RUNOFF FROM THE <br />PROJECT DURING CONSTRUCTION SHALL BE PROTECTED SO THAT <br />SEDIMENT-LADEN WATER WILL BE FILTERED BEFORE ENTERING <br />THE CONVEYANCE SYSTEM. <br />6. TRENCH DEWATERING DEVICES SHALL BE DISCHARGED IN A <br />MANNER THAT WILL NOT ADVERSELY AFFECT STREAMS, DRAINAGE <br />SYSTEMS, OR OFF-SITE PROPERTIES. <br />7. TRACKING OF SOIL, MUD, OR DEBRIS OFF-SITE IS NOT ALLOWED. <br />SOIL, MUD, OR DEBRIS TRACKED ONTO A PUBLIC ROADWAY SHALL <br />BE REMOVED BY THE END OF THAT WORKING DAY. <br />8. ALL DISTURBED AREAS SHALL BE HYDROSEEDED WITH EROSION <br />CONTROL SEED MIX. <br />9. NO MATERIAL SHALL BE STOCKPILED ON PAVEMENT WITHOUT <br />AUTHORIZATION FROM THE PROJECT ENGINEER OR OWNERS <br />REPRESENTATIVE. <br />10. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE <br />REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION HAS <br />BEEN ACHIEVED OR AFTER THE MEASURES ARE NO LONGER <br />NEEDED. SEDIMENT COLLECTED IN TRAPS, PONDS, OR SILT FENCE <br />SHALL BE REMOVED AND DISPOSED IN AN APPROVED MANNER OR <br />STABILIZED ON SITE. <br />11. THE GENERATION OF DUST SHALL BE MINIMIZED BY THE <br />SPRAYING OF WATER TO KEEP SOILS MOIST, MINIMIZING DROP <br />HEIGHT DURING EARTHWORK, LIMITING DRIVING SPEED ON-SITE TO <br />15 MPH, AND AVOIDING WORK DURING HIGH WIND PERIODS. <br />12. CONTRACTOR SHALL SECURE ALL STORAGE AREAS. <br />13. CONTRACTOR SHALL PROVIDE ALL EROSION CONTROL <br />MEASURES REQUIRED FOR STORAGE AND STOCKPILE AREAS. <br />14. ALL MATERIAL STORED ON SITE SHALL HAVE PROPER <br />ENCLOSURES AND/OR COVERINGS. <br />48 <br /> <br />f <br />t <br />44 <br />' <br />- <br />6 <br />" <br />EXISTING WW TANK DEADMAN ANCHORAGE <br />FOR REFERENCE ONLY <br />EXISTING WW TANK DETAIL <br />FOR REFERENCE ONLY <br />16 18 <br />5 <br />LIMITS OF <br />EXCAVATION <br />INLET PROTECTION <br />5. EXISTING CONCRETE RETAINING WALL AND STRUCTURAL SLOPE <br />TO REMAIN. TEMPORARY SHORING REQUIRED PER SECTION <br />7-08.3(1)B OF THE WSDOT STADARD SPECIFICATIONS <br />01/22/26
The URL can be used to link to this page
Your browser does not support the video tag.