Laserfiche WebLink
JOB NO: <br />DRAWING FILE NO: <br />DATE: <br />DESIGNER: <br />BY <br />DA <br />T <br />E <br />RE <br />V <br />I <br />S <br />I <br />O <br />N <br />S <br />DRAWN BY: <br />SH <br />E <br />E <br />T <br /> <br />T <br />I <br />T <br />L <br />E <br />: <br />OF <br />DRAWING NO: <br />SHEET NO: <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />N <br />A <br />M <br />E <br />: <br />SEAL: <br />APPROVED BY: <br />CL <br />E <br /> <br />E <br />L <br />U <br />M <br /> <br />T <br />R <br />A <br />N <br />S <br />F <br />E <br />R <br /> <br />S <br />T <br />A <br />T <br />I <br />O <br />N <br />CL <br />E <br /> <br />E <br />L <br />U <br />M <br />, <br /> <br />W <br />A <br /> <br />9 <br />8 <br />9 <br />2 <br />2 <br />JUNE 2025 <br />_22-000186 X-TLBK <br />17 <br />KI <br />T <br />T <br />I <br />T <br />A <br />S <br /> <br />C <br />O <br />U <br />N <br />T <br />Y <br />25 <br /> <br />N <br /> <br />W <br />E <br />N <br />A <br />T <br />C <br />H <br />E <br />E <br /> <br />A <br />V <br />E <br />, <br /> <br />S <br />U <br />I <br />T <br />E <br /> <br />2 <br />3 <br />8 <br />, <br /> <br /> <br />W <br />E <br />N <br />A <br />T <br />C <br />H <br />E <br />E <br />, <br /> <br />W <br />A <br /> <br />9 <br />8 <br />8 <br />0 <br />1 <br />P: <br /> <br />5 <br />0 <br />9 <br />. <br />8 <br />8 <br />6 <br />. <br />3 <br />2 <br />6 <br />5 <br />SC <br />J <br />A <br />L <br />L <br />I <br />A <br />N <br />C <br />E <br />. <br />C <br />O <br />M <br />--/--/---- <br />SEC. 21, T 20 N., R 15 E., W.M. <br />SI <br />T <br />E <br /> <br />P <br />L <br />A <br />N <br />22-000186 SP-01 <br />SP-02 <br />J VERDUZCO <br />16 <br />K SHIFFLET <br />D IRELAND <br />17 18 <br />CONSTRUCTION NOTES: <br />1. INSTALL NEW 5,000 GALLON WW STORAGE TANK. SEE DETAIL <br />SHEET DT-01. <br />2. EXTEND ELECTRICAL CONDUIT TO NEW HOLDING TANK AND <br />RE-INSTALL SENSOR PER MANUFACTURER INSTRUCTIONS. <br />MATCH EXISTING CONDUIT AND TRENCH BEDDING. <br />3. 2" DIAMETER VENT PIPE. CONNECT TO EXISTING PIPE AND <br />INSTALL INTO NEW WW TANK PER MANUFACTURER <br />INSTRUCTIONS. SEE SANITARY TRENCH DETAIL SHEET DT-01. <br />EXISTING VENT DETAIL THIS SHEET PROVIDED FOR REFERENCE. <br />4. 4" DIAMETER WW PIPE. CONNECT TO EXISTING PIPE AND <br />INSTALL INTO NEW WW TANK PER MANUFACTURER <br />INSTRUCTIONS. MATCH EXISTING PIPE AND SLOPE. SEE <br />SANITARY SEWER TRENCH DETAIL SHEET DT-01. <br />5. INSTALL NINE (9) BOLLARDS FIVE FEET FROM THE EDGE OF <br />THE TANK FOR PROTECTION. BOLLARDS PER WSDOT STANDARD <br />PLAN H-60.20-01 "BOLLARD TYPE 2". <br />LEGEND: <br />EX. WASTE WATER TANK <br />EX. ELECTRICAL CONDUIT <br />EX. RETAINING WALL <br />WASTE WATER TANK <br />BOLLARD <br /># <br />SCALE IN FEET <br />0 20 40 <br />NOTES: <br />1. REPAIR/RESTORE EXISTING GRAVEL DRIVE AND PARKING WHERE <br />DISTURBED FOR CONSTRUCTION. <br />2. CONTOURS SHOWN ARE FINISHED GRADE. RETURN SITE TO <br />FINISHED GRADE CONTOURS AFTER TANK REPLACEMEMENT. <br />EXISTING WW TANK VENT <br />N.T.S. <br />CONNECT NEW WW <br />TANK VENT PIPE <br />TO EXISTING AUGUST 2025 <br />E <br />E 1 <br />2 <br />3 <br />4 <br />EXISTING TANK <br />LOCATION SHOWN <br />FOR REFERENCE <br />LIMITS OF <br />EXCAVATION <br />5 <br />5 ft <br />TY <br />P <br />01/22/26