Laserfiche WebLink
JOB NO: <br />DRAWING FILE NO: <br />DATE: <br />DESIGNER: <br />BY <br />DA <br />T <br />E <br />RE <br />V <br />I <br />S <br />I <br />O <br />N <br />S <br />DRAWN BY: <br />SH <br />E <br />E <br />T <br /> <br />T <br />I <br />T <br />L <br />E <br />: <br />OF <br />DRAWING NO: <br />SHEET NO: <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />N <br />A <br />M <br />E <br />: <br />SEAL: <br />APPROVED BY: <br />CL <br />E <br /> <br />E <br />L <br />U <br />M <br /> <br />T <br />R <br />A <br />N <br />S <br />F <br />E <br />R <br /> <br />S <br />T <br />A <br />T <br />I <br />O <br />N <br />CL <br />E <br /> <br />E <br />L <br />U <br />M <br />, <br /> <br />W <br />A <br /> <br />9 <br />8 <br />9 <br />2 <br />2 <br />JUNE 2025 <br />_22-000186 X-TLBK <br />17 <br />KI <br />T <br />T <br />I <br />T <br />A <br />S <br /> <br />C <br />O <br />U <br />N <br />T <br />Y <br />25 <br /> <br />N <br /> <br />W <br />E <br />N <br />A <br />T <br />C <br />H <br />E <br />E <br /> <br />A <br />V <br />E <br />, <br /> <br />S <br />U <br />I <br />T <br />E <br /> <br />2 <br />3 <br />8 <br />, <br /> <br /> <br />W <br />E <br />N <br />A <br />T <br />C <br />H <br />E <br />E <br />, <br /> <br />W <br />A <br /> <br />9 <br />8 <br />8 <br />0 <br />1 <br />P: <br /> <br />5 <br />0 <br />9 <br />. <br />8 <br />8 <br />6 <br />. <br />3 <br />2 <br />6 <br />5 <br />SC <br />J <br />A <br />L <br />L <br />I <br />A <br />N <br />C <br />E <br />. <br />C <br />O <br />M <br />--/--/---- <br />SEC. 21, T 20 N., R 15 E., W.M. <br />EX <br />I <br />S <br />T <br />I <br />N <br />G <br /> <br />C <br />O <br />N <br />D <br />I <br />T <br />I <br />O <br />N <br />S <br /> <br />P <br />L <br />A <br />N <br />22-000186 SP-01 <br />SP-01 <br />J VERDUZCO <br />14 <br />K SHIFFLET <br />D IRELAND <br />SCALE IN FEET <br />0 20 40 <br />LOCATION #1 <br />LOCATION #2 <br />1 <br />2 <br />EXISTING WW <br />UNDERGROUND <br />STORAGE TANK <br />NOTES: <br />1. SEQUENCE CONSTRUCTION SO AS TO MINIMIZE CLOSURE OF <br />ACCESS ROAD TO THE EXTENT POSSIBLE. <br />2. DURING GEOTECHNICAL EXPLORATION A LAYER OF COAL DUST <br />WAS FOUND IN THE UPPER 4' OF EXSITING GROUND. CARE SHOULD <br />BE TAKEN TO PROTECT WORKERS FROM COAL DUST INHALATION <br />HEALTH HAZARD PER WAC REGULATIONS. <br />3. UNLESS NOTED OTHERWISE, UTILITIES SHOWN ON THESE PLANS <br />ARE LOCATED TO THE BEST INFORMATION AVAILABLE AT THE TIME <br />OF PRINTING. THE CONTRACTOR SHALL VERIFY PRIOR TO <br />CONSTRUCTION. <br />4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION <br />AND PROTECTION OF ALL EXISTING UTILITIES. THE CONTRACTOR <br />SHALL VERIFY ALL UTILITY LOCATIONS PRIOR TO THE START OF <br />CONSTRUCTION BY CALLING 811, THE UNDERGROUND LOCATE LINE, <br />A MINIMUM OF 48 HOURS (TWO WORKING DAYS) PRIOR TO ANY <br />EXCAVATION. <br />AUGUST 2025 <br />15 18 <br />01/22/26