My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-0206 Cle Elum Transfer Station Project Manual
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-0206 Cle Elum Transfer Station Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:38:37 PM
Creation date
4/2/2026 12:23:36 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Agreement for Services with Gibson and Son for the New Entrance and Tank Replacement at the Cle Elum Transfer Station
Order
4
Placement
Consent Agenda
Row ID
143218
Type
Agreement
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY SOLID WASTE ON-CALL <br />CLE ELUM TRANSFER STATION FRONT ENTRANCE DESIGN AND TANK REPLACEMENT <br />SEPTEMBER 2025 Table of Contents <br /> <br /> 000110 - 2 <br />SECTION 000110 <br />TABLE OF CONTENTS <br />SPECIFICATIONS PAGES <br /> <br /> <br /> <br /> <br /> <br /> <br />DIVISION 01—GENERAL REQUIREMENTS <br />011000 Summary .................................................................................................1- 1 <br />012500 Substitution Procedures ..........................................................................1- 2 <br />013000 Administrative Requirements ...................................................................1- 5 <br />013216 Construction Progress Schedule ................................................................. 1 <br />014000 Quality Requirements ..............................................................................1- 3 <br />014216 Definitions ................................................................................................... 1 <br />015100 Temporary Utilities ...................................................................................... 1 <br />015500 Vehicular Access and Parking ..................................................................... 1 <br />015713 Temporary Erosion and Sediment Control ...............................................1- 5 <br />016000 Product Requirements .............................................................................1- 2 <br />017000 Execution and Closeout Requirements....................................................1- 3 <br />017800 Closeout Submittals ................................................................................1- 2 <br />DIVISION 02—EXISTING CONDITIONS <br /> <br />011000 Underground Storage Tank Removal ......................................................1- 3 <br /> <br />DIVISION 31—EARTHWORK <br /> <br />312316 Excavation ..............................................................................................1- 2 <br />312316.13 Trenching ................................................................................................1- 2 <br /> <br />DIVISION 33—UTILITIES <br /> <br />333113 Site Sanitary Sewerage Gravity Piping ....................................................1- 2 <br />333413 Wastewater Tanks...................................................................................1- 3 <br /> <br />FRONT ENTRANCE DESIGN <br /> <br /> Construction Specifications ................................................................ 1- 105 <br /> <br />DRAWINGS (BOUND SEPARATELY) <br /> <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.