My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-0206 Cle Elum Transfer Station Project Manual
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-0206 Cle Elum Transfer Station Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:38:37 PM
Creation date
4/2/2026 12:23:36 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Agreement for Services with Gibson and Son for the New Entrance and Tank Replacement at the Cle Elum Transfer Station
Order
4
Placement
Consent Agenda
Row ID
143218
Type
Agreement
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY SOLID WASTE ON-CALL <br />CLE ELUM TRANSFER STATION TANK REPLACEMENT <br /> SEPTEMBER 2025 Summary <br /> 011000 - 1 <br /> <br />SECTION 011000 <br />SUMMARY <br />PART 1 GENERAL <br />1.01 PROJECT <br />A. Project Name: Cle Elum Transfer Station Tank Replacement. <br />B. The Project consists of the removal and replacement of an existing underground 5,000 gallon <br />holding tank for the storage of graywater, and corrosive and reactive liquids. All existing <br />connections to the tank (4” sanitary sewer pipe, 2” vent pipe, conduit and alarm system, etc) will <br />need to be disconnected and removed as necessary for excavation. A new tank is to be <br />installed at the same location and all appurtenances rec onnected. Backfill and testing per <br />manufacturers recommendation. <br />1.02 OWNER OCCUPANCY <br />A. The Transfer Station will remain in operation during construction. <br />B. Cooperate with Owner to minimize conflict and to facilitate Owner's operations. <br />C. Schedule the Work to accommodate Owner’s operations. <br />1.03 CONTRACTOR USE OF SITE AND PREMISES <br />A. Construction Operations: Limited to areas noted on Drawings or as coordinated with owner. <br />1. Locate and conduct construction activities in ways that will limit disturbance to site. <br />B. Provide access to and from site as required by law and by Owner: <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.