Laserfiche WebLink
2/6/26, 1:53 PM <br />Journey Level Wages <br />Power Equipment <br />Concrete Pump: Truck <br />Operators- Underground <br />Mount With Boom <br />$89.28 <br />151 <br />11G <br />8X <br />Sewer & Water <br />Attachment Up To 42m <br />Power Equipment <br />Operators- Underground <br />Conveyors <br />$88.60 <br />i5J <br />11G <br />8X <br />Sewer & Water <br />Power Equipment <br />Cranes Friction: 200 tons <br />Operators- Underground <br />$90.88 <br />7A <br />11H <br />8X <br />and over <br />Sewer & Water <br />Power Equipment <br />Cranes, A-frame:10 tons <br />Operators- Underground <br />$82.95 <br />7A <br />11H <br />8X <br />and under <br />Sewer & Water <br />Cranes:100 tons through <br />Power Equipment <br />199 tons, or 150' of boom <br />Operators- Underground <br />$89.09 <br />7A <br />11H <br />8X <br />(including jib with <br />Sewer & Water <br />attachments) <br />Power Equipment <br />Cranes: 20 tons through <br />Operators- Underground <br />$87.42 <br />7A <br />11H <br />8X <br />44 tons with attachments <br />Sewer & Water <br />Cranes: 200 tons- 299 <br />Power Equipment <br />tons, or 250' of boom <br />Operators- Underground <br />$90.00 <br />7A <br />11H <br />8X <br />including jib with <br />Sewer & Water <br />attachments <br />Cranes: 300 tons and <br />Power Equipment <br />over or 300' of boom <br />Operators- Underground <br />$90.88 <br />7A <br />11H <br />8X <br />including jib with <br />Sewer & Water <br />attachments <br />https://secure.Ini.wa.gov/wagelookup/rates/journey-level-rates 27/43 <br />