Laserfiche WebLink
2/6/26, 1:53 PM <br />Journey Level Wages <br />Power Equipment <br />Operators- Underground <br />Brooms <br />$84.69 <br />151 <br />Sewer & Water <br />Power Equipment <br />Operators- Underground <br />Bump Cutter <br />$89.28 <br />i5J <br />Sewer & Water <br />Power Equipment <br />Operators- Underground <br />Cableways <br />$90.09 <br />151 <br />Sewer & Water <br />Power Equipment <br />Operators- Underground <br />Chipper <br />$89.28 <br />151 <br />Sewer & Water <br />Power Equipment <br />Operators- Underground <br />Compressor <br />$84.69 <br />151 <br />Sewer & Water <br />Power Equipment <br />Concrete Finish Machine <br />Operators- Underground <br />$84.69 <br />i5J <br />- Laser Screed <br />Sewer & Water <br />Concrete Pump - <br />Power Equipment <br />Mounted Or Trailer High <br />Operators- Underground <br />$88.60 <br />151 <br />Pressure Line Pump, <br />Sewer & Water <br />Pump High Pressure <br />Power Equipment <br />Concrete Pump: Truck <br />Operators- Underground <br />Mount With Boom <br />$90.09 <br />151 <br />Sewer & Water <br />Attachment Over 42 M <br />11G 8X <br />11G 8X <br />11G 8X <br />11G 8X <br />11G 8X <br />11G 8X <br />11G 8X <br />11G 8X <br />https://secure.Ini.wa.gov/wagelookup/rates/journey-level-rates 26/43 <br />