Laserfiche WebLink
2/6/26, 1:53 PM <br />Journey Level Wages <br />Cranes: 45 tons through <br />Power Equipment <br />99 tons, under 150' of <br />Operators- Underground <br />$88.20 <br />7A <br />boom(includingjib with <br />Sewer & Water <br />attachments) <br />Power Equipment <br />Cranes: Friction cranes <br />Operators- Underground <br />$90.00 <br />7A <br />through 199 tons <br />Sewer & Water <br />Power Equipment <br />Cranes: through 19 tons <br />Operators- Underground <br />with attachments, a- <br />$86.75 <br />7A <br />Sewer & Water <br />frame over 10 tons <br />Power Equipment <br />Operators- Underground <br />Crusher <br />$89.28 <br />151 <br />Sewer & Water <br />Power Equipment <br />Deck Engineer/Deck <br />Operators- Underground <br />$89.28 <br />151 <br />Winches (power) <br />Sewer & Water <br />Power Equipment <br />Derricks, On Building <br />Operators- Underground <br />$88.20 <br />7A <br />Work <br />Sewer & Water <br />Power Equipment <br />Operators- Underground <br />Dozers D-9 & Under <br />$88.60 <br />i5J <br />Sewer & Water <br />Power Equipment <br />Drill Oilers: Auger Type, <br />Operators- Underground <br />$88.60 <br />151 <br />Truck Or Crane Mount <br />Sewer & Water <br />11H 8X <br />11H 8X <br />11G 8X <br />11G 8X <br />11H 8X <br />11G 8X <br />11G 8X <br />https://secure.Ini.wa.gov/wagelookup/rates/journey-level-rates 28/43 <br />