My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-0206 Cle Elum Transfer Station Project Manual
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-0206 Cle Elum Transfer Station Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:38:37 PM
Creation date
4/2/2026 12:23:36 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Agreement for Services with Gibson and Son for the New Entrance and Tank Replacement at the Cle Elum Transfer Station
Order
4
Placement
Consent Agenda
Row ID
143218
Type
Agreement
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY SOLID WASTE ON-CALL <br />CLE ELUM TRANSFER STATION FRONT ENTRANCE DESIGN <br />PW\JA\KITTCO02\ENTRANCE AGGREGATE BASE COURSES <br />JUNE 2023 32 11 23 - 3 <br />©COPYRIGHT 2023 JACOBS <br />2.03 SOURCE QUALITY CONTROL <br />A. Perform tests necessary to locate acceptable source of materials meeting <br />specified requirements. <br />B. Final approval of aggregate material will be based on test results of installed <br />materials. <br />C. Should separation of coarse from fine materials occur during processing or <br />stockpiling, immediately change methods of handling materials to correct <br />uniformity in grading. <br />PART 3 EXECUTION <br />3.01 SUBGRADE PREPARATION <br />A. As specified in Section 31 23 13, Subgrade Preparation. <br />B. Obtain Engineer’s acceptance of subgrade before placing base course or <br />surfacing material. <br />C. Do not place base course or surfacing materials in snow or on soft, muddy, or <br />frozen subgrade. <br />3.02 EQUIPMENT <br />A. Compaction Equipment: Adequate in design and number to provide <br />compaction and to obtain specified density for each layer. <br />3.03 HAULING AND SPREADING <br />A. In accordance with Division 4-04.3 of the Standard Specifications. <br />B. Hauling Materials: <br />1. Do not haul over surfacing in process of construction. <br />2. Loads: Of uniform capacity. <br />3. Maintain consistent gradation of material delivered; loads of widely <br />varying gradations will be cause for rejection. <br />C. Spreading Materials: <br />1. Distribute material to provide required density, depth, grade, and <br />dimensions with allowance for subsequent lifts.
The URL can be used to link to this page
Your browser does not support the video tag.