My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-0206 Cle Elum Transfer Station Project Manual
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-0206 Cle Elum Transfer Station Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:38:37 PM
Creation date
4/2/2026 12:23:36 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Agreement for Services with Gibson and Son for the New Entrance and Tank Replacement at the Cle Elum Transfer Station
Order
4
Placement
Consent Agenda
Row ID
143218
Type
Agreement
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY SOLID WASTE ON-CALL <br />CLE ELUM TRANSFER STATION FRONT ENTRANCE DESIGN <br />PW\JA\KITTCO02\ENTRANCE EXCAVATION <br />JUNE 2023 31 23 16 - 3 <br />©COPYRIGHT 2023 JACOBS <br />b. Greater than 4-inch Outside Diameter or Width: 18 inches greater <br />than outside diameter or width of pipe, conduit, direct-buried <br />cable, or duct bank. <br />2. Multiple Pipes, Conduits, Cables, or Duct Banks in Single Trench: <br />18 inches greater than aggregate width of pipes, conduits, cables, duct <br />banks, plus space between. <br />3. Increase trench widths by thicknesses of sheeting. <br />B. Maximum Trench Width: Unlimited, unless otherwise shown or specified, or <br />unless excess width will cause damage to existing facilities, adjacent property, <br />or completed Work. <br />3.04 EMBANKMENT AND CUT SLOPES <br />A. Shape, trim, and finish cut slopes to conform with lines, grades, and cross- <br />sections shown, with proper allowance for topsoil or slope protection, where <br />shown. <br />B. Remove stones and rock that exceed 3-inch diameter and that are loose and <br />may roll down slope. Remove exposed roots from cut slopes. <br />C. Round tops of cut slopes in soil to not less than a 6-foot radius, provided such <br />rounding does not extend offsite or outside easements and rights-of-way, or <br />adversely impacts existing facilities, adjacent property, or completed Work. <br />3.05 STOCKPILING EXCAVATED MATERIAL <br />A. Stockpile excavated material that is suitable for use as fill or backfill until <br />material is needed. <br />B. Confine stockpiles to within easements, rights-of-way, and approved Work <br />area. Do not obstruct roadways or access to stockpiles. <br />C. Do not stockpile excavated material adjacent to trenches and other <br />excavations unless excavation sideslopes and excavation support systems are <br />designed, constructed, and maintained for stockpile loads. <br />D. Do not stockpile excavated materials near or over existing facilities, adjacent <br />property, or completed Work, if weight of stockpiled material could induce <br />excessive settlement.
The URL can be used to link to this page
Your browser does not support the video tag.