My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-02-10-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-02-10-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:36:27 PM
Creation date
4/2/2026 12:23:25 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
143218
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ALL estimates are for in -stock colors for powder coating <br />Additional Items Can Be Added as Change Orders as Needed. <br />This does not include any rental equipment, onsite welding, woodwork, or painting. <br />We will need your resetter's permit to avoid any taxes. <br />This does not include any administration fees. <br />Pricing could change if the whole estimate is not accepted. <br />For the International Swimming Pool and Spa Code, the contractor or homeowner is solely responsible <br />for ensuring all approved fencing or railings meet code requirements. Cascade Powder Coating is not <br />responsible for any fencing or railing that is not in compliance with city, county, or state codes that have <br />been approved by the contractor/homeowner. <br />Thank You, <br />Shane Dressel <br />Estimator <br />Cascade Powder Coating <br />(509) 663-9080 <br />Mon.-Thur. 7arn-4:30prn Fri. 7arn-11arn <br />912 S. Columbia St. Wenatchee, WA 98801 <br />11 Bridge St. Wenatchee, WA 98801 <br />http://www.cascadepowdercoating.com/ <br />From: Carley Gangle <carleyg@cascadecentral.us> <br />Sent: Monday, December 29, 2025 3:27 PM <br />To: Shane Dressel <Sdressel@cascadepowdercoating.com> <br />Cc: KC Carroll <kc@cascadecentral.us>; Rusty McDonnell <rusty@cascadecentral.us> <br />Subject: RE: Ellensburg Rodeo RFP-003 — Stage Relocation <br />Hi Shane, <br />Yes, please provide an estimate for the railings in those 2 Locations. <br />kill, M <br />Carley Sabedra <br />Cascade Central Construction I Project Engineer <br />Phone: 509-881-4076 <br />
The URL can be used to link to this page
Your browser does not support the video tag.