My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-02-10-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-02-10-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:36:27 PM
Creation date
4/2/2026 12:23:25 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
143218
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
McGann Electric <br />Contractor BreakdoTA <br />Project Name: Ellensburg Rodeo Arena RFP 03 Stage Revision / Relocation <br />Project No. Source Documents: Jack McGann <br />Contractor: McGann Electric Contract <br />Description: Provide and install new light pole and type (X2) fixture. Provide new pole base for X2 fixture. <br />and wire from new pole to adjacant light pole circuit #17. Provide and install 2 new type (KC) <br />location and layout. Provide and install branch conduit and wiring to new fixtures from existin. <br />install 1 new type (N) fixture at new stage location. Provide and install UG conduit and wiring <br />existing (N) fixture location on mens restroom rm 237. Provide and install new 4" UG racewa, <br />FOH/MIX position riser for IT or AV future cabling. Stub up 4" rigid raceway at both locations <br />removable conduit plug for weather tight application. Provide and install pull string in 4" cond <br />UG conduits from panel 1-3A to new power pedestals along west fence line. Provide and insti <br />panel L3A to power pedestals - 2 circuits per pedestal. Provide new pole base for each pede <br />install 2 - Leviton 2PH18-2Z Power pedestals at west fence line. Provide and install 3 - 20A 1 <br />Utilize spare breaker in panel L3A for the 4th added circuit. All conduit, fittings, supports, har( <br />light fixtures, devices, power pedestals included. Exclusions: trenching, backfill, pole base in: <br />1. CRAFT LABOR COSTS <br />Direct Labor Costs: <br />Itemize all costs on attached COP ( <br />a. crew (apprentices, journeymen, & laborers) $ 19,454.80 <br />b. foreman $ - <br />c. superintendent $ - <br />DIRECT LABOR SUBTOTAL $ 19,454.80 <br />Supervision: <br />d. direct supervision (NTE IS% of 1a) <br />e. safety (NTE 2% of lines 1a, b, & c) $ 389.10 <br />1. CRAFT LABC <br />2. MATERIAL COSTS <br />a. material costs $ 11,499.56 <br />b. freight costs (itemize) <br />2. MATERI, <br />3. EQUIPMENT COSTS <br />a. owned equipment (per spec approved source) $ <br />b. rental equipment (per invoices attached) <br />3. EQUIPME <br />4. SMALL TOOLS <br />a. small tools (NTE 5% of I & b) $ 992.20 <br />4. SMA <br />SU BTOTj <br />5. OVERHEAD & PROFIT <br />a. NTE 15% portion of 1, 2, 3, & 4 up to $50,000 $ 5,173.76 <br />b. $ - <br />5.OVERHEAD <br />6. SUB -SUBCONTRACTORS <br />a. <br />b. <br />
The URL can be used to link to this page
Your browser does not support the video tag.