Laserfiche WebLink
Carlev Ganale <br />From: Shane Dressel <Sdressel@cascadepowdercoating.com> <br />Sent: Tuesday, December 30, 2025 4:25 PM <br />To: Carley Gangle <br />Cc: KC Carroll; Rusty McDonnell <br />Subject: Re: Ellensburg Rodeo RFP-003 — Stage Relocation <br />Hi Carley, <br />This estimate was done at prevailing wage. <br />Ptease verify this estimate has all the work accounted for. <br />If you accept this estimate, I wilt add it to your current job and send you a change order. <br />This estimate includes Materials, Fab labor, CNC Table, Design Labor, Basic 2D Drawing, Sandblasting, <br />Powder Coating with in stock Colors, Measuring, Test Fit, and Installation. <br />1. 13' of Pipe Railing for the Stairs to the Stage, 27of Pipe Railing for the Ramp to the Stage. All railing will <br />be approx. 3 feet high. I am assuming these will be mounted into the concrete as the other railings <br />behind the arena. <br />Materials - 1.5" SCH 40 Pipe, <br />Total $11,638.00 Tax not included <br />I I <br />This Estimate Expires on 1. 16.26 <br />Please verify this estimate has all the work accounted for. <br />0% Deposit Secures Placement on Estimated Fabrication Schedule. If the cost of materials is greater <br />than the percentage amount for the deposit, the material amount will be bitted for the deposit amount. <br />Work wilt not start until deposit is paid in ful.l. I.E. Final, Measures, All Drawings, Fabrication, etc... Deposit <br />is non-refundable after materials have been purchased, measuring completed, or drawings have been <br />done. <br />Any portion of the estimate that is cancelled bythe contractor/site owner after materials have been <br />purchased will not be subject for a refund/credit. <br />You may pay by e-check using the link below. Or if you'd like to pay with a credit card, there is a 3% <br />surcharge. Please call to pay using a credit card. <br />Remaining Balance Due Upon Job Completion. <br />All Jobs are Subject to Progress Invoicing Monthly. <br />Cost of Materials is Subject to Change at Time of Purchase Due to Market Volatility. <br />