My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-02-10-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-02-10-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:36:27 PM
Creation date
4/2/2026 12:23:25 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
143218
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Carlev Ganale <br />From: Shane Dressel <Sdressel@cascadepowdercoating.com> <br />Sent: Tuesday, December 30, 2025 4:25 PM <br />To: Carley Gangle <br />Cc: KC Carroll; Rusty McDonnell <br />Subject: Re: Ellensburg Rodeo RFP-003 — Stage Relocation <br />Hi Carley, <br />This estimate was done at prevailing wage. <br />Ptease verify this estimate has all the work accounted for. <br />If you accept this estimate, I wilt add it to your current job and send you a change order. <br />This estimate includes Materials, Fab labor, CNC Table, Design Labor, Basic 2D Drawing, Sandblasting, <br />Powder Coating with in stock Colors, Measuring, Test Fit, and Installation. <br />1. 13' of Pipe Railing for the Stairs to the Stage, 27of Pipe Railing for the Ramp to the Stage. All railing will <br />be approx. 3 feet high. I am assuming these will be mounted into the concrete as the other railings <br />behind the arena. <br />Materials - 1.5" SCH 40 Pipe, <br />Total $11,638.00 Tax not included <br />I I <br />This Estimate Expires on 1. 16.26 <br />Please verify this estimate has all the work accounted for. <br />0% Deposit Secures Placement on Estimated Fabrication Schedule. If the cost of materials is greater <br />than the percentage amount for the deposit, the material amount will be bitted for the deposit amount. <br />Work wilt not start until deposit is paid in ful.l. I.E. Final, Measures, All Drawings, Fabrication, etc... Deposit <br />is non-refundable after materials have been purchased, measuring completed, or drawings have been <br />done. <br />Any portion of the estimate that is cancelled bythe contractor/site owner after materials have been <br />purchased will not be subject for a refund/credit. <br />You may pay by e-check using the link below. Or if you'd like to pay with a credit card, there is a 3% <br />surcharge. Please call to pay using a credit card. <br />Remaining Balance Due Upon Job Completion. <br />All Jobs are Subject to Progress Invoicing Monthly. <br />Cost of Materials is Subject to Change at Time of Purchase Due to Market Volatility. <br />
The URL can be used to link to this page
Your browser does not support the video tag.