My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-02-10-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-02-10-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:36:27 PM
Creation date
4/2/2026 12:23:25 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
143218
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HUBER BROTHERS, LLC <br />411 Keys Road • YAKIMA, WA. 98901 • FAX: (509) 452-6265 • Telephone (509) 457-1555 • tan@huberbros.com <br />Proposal to Supply Material <br />Date <br />1/28/2026 <br />Submitted to <br />Aden Masonry <br />Attention <br />Dan Aden <br />Project <br />Ellensburg Rodeo Arena Improvements <br />Ellensburg, WA <br />We hereby submit specifications and estimates for furnishing the reinforcing steel on the above <br />referenced project. <br />Rebar: <br />Deleted 30-0 long masonry wall at the "Behind The Chutes" Stage <br />-Furnish Only $425.00 <br />Excludes: Retainage on material. <br />*** This proposal may be withdrawn by us if not accepted <br />within 15 days * * * <br />We require a minimum of 2 weeks lead time for first submittals after receipt of CAD <br />files or drawings for our use. 3 weeks lead time to fabricate and deliver bar plus review <br />time by architecdengineer, <br />Huber Brothers, LLC — Terms and Conditions for Material Sale <br />1. General Contractor to provide hoisting and operator to unload material. <br />2. Unless otherwise noted, prices quoted for FOB truck jobsite are nearest point <br />accessible to 48' trailers, full truck load quantities. <br />3. Any reference to approximate quantities or approximate weights is for <br />convenience only. <br />4. In the event the Customer accepts only a portion of the Bid items quoted, <br />Huber Brothers, LLC reserves the right to reject the Quote in its entirety, <br />reject a portion thereof, or re -quote specifically for the Customers request <br />whether for Material or Labor or a combination of furnish and install. <br />5. Unless specifically noted on the proposal the General Contractor is <br />responsible for verifying quantities on all unit price bid items including Wire <br />Mesh, Smooth Dowels, Mechanical Couplers and Form Savers. <br />6. Prices include supply, detailing and fabrication. I understand that Huber <br />Brothers, LLC has created this Bid Quote based upon information provided <br />by me. I agree to pay all sums owed for the materials ordered and delivered <br />and for labor performed less any agreed retainage within 30 days of invoice <br />receipt. Compound interest at 18% per annum shall accrue on all sums <br />owed but not paid when due. If any legal proceedings are needed to collect <br />amounts owed, the party prevailing in any proceeding shall be entitled to <br />recover their actual attorney's fees and costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.