My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-02-10-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-02-10-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:36:27 PM
Creation date
4/2/2026 12:23:25 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
143218
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. The Bid items are supplied according to the specifications <br />identified by the General Contractor. Thus the Bid items are <br />accepted "AS IS" and Huber Brothers, LLC, -disclaims all <br />warranties, express and implied, including the warranty of fitness <br />for a particular purpose and warranty of merchantability. <br />General Contractor represents and warrants that once the Bid <br />items are delivered on site, General Contractor has accepted the <br />Bid items with all faults (if any). <br />a. This provision was explicitly negotiated and bargained for by <br />Huber Brothers, LLC, and General Contractor. Initials: <br />General Contractor Huber Brothers, LLC <br />Huber Brothers, LLC — Job Specific Exclusions <br />1. No retainage on Materials <br />2. All site work, unless otherwise noted <br />3. Placing accessories such as dobies, standees, tie wire, support steel, safety <br />caps, etc. Unless Huber Brothers, LLC is awarded the placing Contract. <br />4. Smooth round dowels unless noted otherwise. <br />5. Wire Mesh unless noted otherwise. <br />6. Welding <br />7. Sales Tax, Use Tax or any other taxes unless noted otherwise. <br />Huber Brothers. LLC - Standard Exclusions <br />1. Added dowels at Construction joints in beams, joist and slabs, where not <br />specifically indicated on plans. <br />2. Threaded Reinforcing bars, painting, dipping or coating of dowels. <br />3. Raiser bars, support bars, wall and slab spacer bars, unless specifically <br />indicated on plans and quoted. <br />4. Mechanical splicing devices, bar raising and positioning accessories. <br />5. All Reinforcing Steel that is welded to structural Steel. <br />6. Post -tensioning and rebar. <br />7. Welded bar mats <br />8. Any additional insurance costs for special wording or endorsements incurred <br />will be passed along to the General Contractor <br />9. Installing Form Savers (male or female) <br />Payment to be made as follows: Monthly payments for material furnished and work accomplished. <br />All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. <br />Any alternation or deviation from above specifications involving extra costs will be executed only upon written orders, and will <br />become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. <br />Owner to carry fire, and any other necessary insurance. Our workers are fully covered by Workmen's Compensation Insurance. <br />Accepted by: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.