Laserfiche WebLink
Project- Ellensburg Rodeo Arena <br />Date: 01/02/26 <br />COP # 1 <br />General: Cascade Central Construction Inc. MASflNRY. tNC. <br />Description: RFP - 003 - Stage Relocation <br />8200 W Brinkley Rd. <br />Kennewick, WA 99338 <br />509-783.6700 <br />clessificaticm <br />City. <br />Units <br />Price Per <br />Unit <br />Labor <br />Amount <br />Material <br />Amount <br />Equipment <br />Amount <br />TOTAL <br />Project Management <br />0 <br />Hour <br />$ 250.00 <br />$ - <br />Supervision <br />0 <br />Hour <br />$ 98.74 <br />$ - <br />Labor <br />.50 <br />Hour <br />$ 88.75 <br />$ (4,337,60) <br />Overtime Labor <br />0 <br />Hour <br />$ 27.30 <br />$ - <br />Safety (2%) <br />$ (86.75) <br />Mob Fee <br />0 <br />Each <br />$ 500.00 <br />$ - <br />Setup Charge <br />0 <br />Each <br />$ 250.00 <br />$ - <br />Block -Smooth <br />0 <br />Each <br />$ 2.70 <br />$ - <br />Block -Split <br />0 <br />Each <br />$ 3.50 <br />$ - <br />Biock-Ground <br />0 <br />Each <br />$ 4.50 <br />$ - <br />Mortar Bag <br />.25 <br />Each <br />$ 10.00 <br />$ (250.00) <br />Grout: Bag <br />0 <br />Each <br />$ 9.20 <br />$ - <br />Grout: Pumped <br />4 <br />Yards <br />$ 250.00 <br />$ (750.00) <br />Rebar (2.6 Ibs per block) <br />0 <br />Lbs <br />$ 0.85 <br />$ - <br />Joint Reinforcing <br />0 <br />Each <br />$ 3.80 <br />$ - <br />Wall Ties <br />0 <br />Each <br />$ 2.50 <br />$ - <br />Washing <br />0 <br />Sq. Ft. <br />$ 0.55 <br />$ - <br />Forklift <br />0 <br />Day <br />$ 400.00 <br />$ - <br />Mixer: 12c.u. Ft. <br />0 <br />Day <br />S 95.00 <br />$ - <br />Biock/Brick Saw <br />0 <br />Day <br />$ 100.00 <br />$ - <br />Quickie Saw <br />0 <br />Day <br />$ 92.00 <br />$ - <br />Roto Hammer <br />0 <br />Day <br />$ $6.00 <br />$ - <br />Grout Pump <br />0 <br />Day <br />$ 330.00 <br />$ - <br />Water Buffalo <br />0 <br />Day <br />$ 185.00 <br />$ - <br />Generator <br />0 <br />Day <br />$ 250.00 <br />$ <br />Peanut Grinder <br />0 <br />Day <br />$ 50,00 <br />$ - <br />#of days <br />#of frames <br />Rate <br />Scaffold, per frame per day <br />$ 3.00 <br />$ - <br />Markups: 15% 15° 15% <br />$ (883.64) <br />$ (150.00) <br />$ - <br />SUBTOTALS <br />$ (3,087.89) <br />$ (1,150.00) <br />$ - <br />$ (6,237.89) <br />8" CMU WALL <br />-P CONT FTG <br />ONGIT & #6T r' <br />r <br />ANSV r' <br />r <br />r <br />7 r <br />r' <br />S-201 <br />r r <br />r r <br />Total b (6,238) <br />There should be a credit for rebar <br />reinforcing on here as well. <br />CCC will provide, once credit is <br />received from Masonry <br />Subcontractor. <br />