My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-02-10-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-02-10-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:36:27 PM
Creation date
4/2/2026 12:23:25 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
143218
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W.H. CRESS PROPOSAL AND QUALIFICATIONS PAGE 3 OF 3 <br />13.) We exclude labeling or distribution of any of our material unless we are installing <br />14.) This quotation will remain in effect for a period of 30 days. <br />15.) Material will have to be shipped within 4 months of the date of this quotation <br />16.) All material is FOB plant with full freight allowed to jobsite unless otherwise noted <br />17.) Installation will be noted if it is included <br />18.) Warranty for all products is one year unless otherwise noted <br />19.) All quotes containing labor are based on using non -union workers <br />20.) Payment is net 30 days with 1 1/2% per month service charge on payments over 30 days or 18% annually <br />21.) Account is subject to credit approval <br />22.) Our bid does not include any allowance for any automated billing systems, <br />23,) We include a completed operations endorsement with our Certificate of Insurance <br />24.) We exclude an ongoing operations endorsement with our Certificate of Insurance <br />25.) Engineering calculations and permits are excluded and are by others. <br />26.) Conflict with post tensioned floors and floor penetration is the contractor's responsibility <br />27.) All electrical hook ups (re; hand dryers) <br />28.) We will NOT accept any prorated back charges for general damages on projects — ie; touch up painting <br />29) We exclude all OSHA 10 and 30 training <br />30) We Exclude All Night Work <br />31) Effective January 1, 2021 an additional 3% transaction fee will be charged on ALL Credit Card Payments <br />32) We exclude any delegated design provision <br />Insurance / Bonding This bid does not include a subcontractor provided Owner 1 Contractor (OCP) <br />insurance policy. This coverage in not available Unless specifically noted this bid does not include any <br />performance or payment bonds If required add 1112% to contract total and notify us at the time the bid is <br />awarded. We Exclude Pollution Liability and Professional Liability Coverage. If required, we can provide a <br />quote but Owner will have to cover the cost. Please see the attached COI with has coverage and limits. Any <br />requirements needed above and beyond this coverage and limits will be at the Owner or Contractor's <br />expense. We do not provide insurance for material only jobs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.