Laserfiche WebLink
Docusign Envelope lD: 01 23E2C2-BCDE-488E-A1A9969@IFBB3CE <br />BELSAAS & SMITH CONSTRUCTION <br />CHANGE ORDER PROPOSAL BREAKDOW}.I SHEET <br />TIME EXTENTION REQUIRED: <br />NOTICE TO PROCEED REQUIRED BY <br />SHEET 2 ot 2 c.o.P. #18 <br />\A/E RESERVE OUR RIGHTS UNDER THE CONTMCT TO ACCESS THIS CHANGE <br />CUMULATIVELY AS IT AFFECTS TIME AND AMOUNT. <br />$ 4.082.00 <br />$ 420.45 <br />$ <br />$ 6.994.27 <br />$ 6.994.27 <br />LABOR <br />COST <br />$ 122.46 <br />69.37$ <br />$ 4.694.28 <br />$ 4.694.28 <br />$ 4.694.28 <br />$ 2.299.99 <br />s <br />$ 2.000.00 <br />$ 206.00 <br />MATERIAL <br />cosr <br />60.00$ <br />33.99$ <br />s 2.299_99 <br />$ 2.299.99 <br />t <br />SUB <br />COST <br />$ <br />$ <br />s <br />$ <br />SUB TOTAL <br />TOTAL <br />s <br />$ <br />EQUIP <br />COST <br />$ <br />$ <br />$ <br />$ <br />TOTALS FROM PREVIOUS PAGE <br />OVERHEAD 3% <br />SUB TOTAL <br />LABOR <br />MATERIAL <br />EQUIPMENT <br />SUBCONTRACTORS <br />SUB TOTAL <br />PREVIOUS CO ALLOWANCE <br />GRAND TOTAL <br />PROFIT 1O% <br />BONDING 1.5% <br />SUB TOTAL <br />IIIIIIIrIIIIIITI