Laserfiche WebLink
Docusign Envelope lD 0123E2C2-BCDE-488E-A1 A9-969064F883CE <br />Change Order <br />'WAIA Document Gzrll' - 2017 <br />PROJECT; lName and address) <br />23 OO7 6 Kitlrtas County Jail Facilities <br />Renovatioo Task 1 <br />205 West Sth Avenue <br />Ellensburg, wA 98926 <br />CONTRACT INFORIIATION: <br />Cotrtract For: Reuovatiou <br />Date: 04-30-2025 <br />CHANGE ORDER II.IFORMATION: <br />Change Orde,r NurnbEr: 008 <br />Date:02-24-2026 <br />COI{TMCTOR: lName and addres s) <br />Belsaas & Smith Corstruction, Inc. <br />103 East 4th Avenue, Ste: 209 <br />OWNER: (Name and address) <br />Ki{itas County <br />2205 West 5thAveoue <br />E[enshrc- WA 98926 <br />ARCHITEGT: (Name and address) <br />KNIT <br />7826 Leary WayNE #200 <br />Redmond. WA S8052 wA 98926 <br />TI{E COIITRACT IS CHANGED AS FOLLOWE: <br />Qnsert a detailed description ofthe change and, i.fapplicable, attach or reference speciJic arhibts. AIso inelude agreed upon <br />adjustments attributable ta uecuted Corstructian Change Directt "'es. ) <br />This change order includes General Contactor's change order proposals COP #18 - Dishrvashing Splash Packet. <br />2.457.000.00 <br />6,994.27 <br />3,7A\972.36 <br />NOTE: This Chaage Order does not include adjustrnents to the Contract Sum or Guaratteed Maximum Price, or the Contract Time' <br />tbat have been authorized by Construction Chaage Directive until the cost and time have been agreed upon by both the Orvner and <br />Coutracior, in which case a Change Order is executed to supersede the Constructioa Change Directive. <br />NOT VALID UI{TIL SIGT.IED BY THE ARCHITECT, COI{TRACTOR AND OWNER. <br />by:by: <br />Tho original Coffiracl Sumwas <br />Tho net change by previously authorized Change orders <br />The Cootract Srun prior to this Change Order was <br />The Cootract sum will be inc,reased by this Chango Order in the amouot of <br />The oew Corrtract Suar iocluding this Change Order will be <br />The Contract Time will be uncbaaged by Zero (0) days. <br />The now date of Substantial Completionwill be Unchanged <br />hhn ilwhnow Sdt (,oilsow,lrEuI <br />(Signat$e)(Signature) <br />BY: Joha Aaderson, Principal BY: Scott Carlson, Project Manager <br />(Printed name, title, and license <br />nwnber ifrequtred) <br />2/26/2026 <br />(Printed name and title) <br />2/26/2026 <br />Date Date <br />-..-.-133?,e78.0e3,694,978.09 <br />$ <br />$ <br />$ <br />$ <br />$ <br />OWilER (Signa/urel <br />BY: Patti Stacey, Facilities <br />Operations Director <br />(Printed name and title) <br />Date <br />AIA Documenl G7O1 -2017. Copyrght O 1979, 1S87, 2000 , 2001 and 2017. All righh reserved. "The American lnstilute of Arclritects," 'Am€rican lnstitute of -_Arcnnects,' 'ltl," lhe AIA Logo, 'a;rd-'an Cortract Odcuments" are tradema*s of The American lnstitute of Architects- This docurnent was produced at 16:12:25 <br />PST on 02/25J2026 under Su-bscription No.20240090396 which expires on 1212N2026, is not for resale, is licensed for one-lime use only, and may only be used <br />in accordance wilh the AIA Contract Docurnentse Terms of Service. To reporl copyrighl violations, e+nail docinfio@aiacontracls.com. <br />Us€r Notcr: (699e3d8819214dca06be8859a) <br />{