Laserfiche WebLink
Docusign Envelope lD: 0123E2C2-BCDE-488E-A1A$96964FBB3CE <br />BELSAAS & SMITH CONSTRUCTION <br />CHANGE ORDER PROPOSAL BREAKDOWN SHEET <br />SHEET 1 of 2 c.o.P. #18 <br />$ 2.450.00 <br />$ 1.632.00 <br />s <br />$ <br />$ <br />$ <br />s <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />s <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />LABOR <br />COST <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ 2.000.00 <br />$ <br />$ <br />s <br />$ <br />$ <br />$ <br />$ <br />$ <br />s <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />s <br />$ <br />$ <br />MATERIAL <br />COST <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />s <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />s <br />$ <br />$ <br />$ <br />SUB <br />COST <br />$ <br />$ <br />s <br />s <br />$ <br />s <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />s <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />EQUIP <br />COSTLABOR <br />2.450.00 <br />1.632.00 <br />EQUIP <br />UNIT COSTS <br />Mat. <br />2.000.00 <br />LS <br />UNIT <br />LS <br />QUAN <br />1 <br />1 <br />DESCRIPTION <br />Dishwashing Splash <br />Stainless Steel Backsolash <br />Demo and Finishes <br /># <br />$2,000.90 $ 4,082.00