Laserfiche WebLink
Cost Breakdown <br />Project Name: Ellensburg Rodeo Arena lmprovments <br />Project No. <br />Gontractor: McGannElectric <br />coP-1 <br />Date: <br />Contractor Ref. No. <br />11t19t2025 <br />Description Quantity <br />Unit <br />Type <br />Labor Material Equipment Total <br />CostUnit $Cost Unit $Cost Unit $Cost <br />$$$ <br />$$$$ <br />Electrician Labor 6 HR $106.95 $ 641.70 $$$ 641.70 <br />Foreman Labor 7 HR $117.14 $ 819.98 $$$ 819.98 <br />$$$$ <br />$$$$ <br />Plastic Handhole 1 EA $$100.02 $ 100.02 $$ 100.02 <br />Fiber Optic Cable 1 LT $$972.97 $ 972.97 $$ 972.97 <br />1 LT $$10.00 $ 10.00 $$10.00 <br />$$$$ <br />$$$$ <br />$$$$ <br />$$$$ <br />$$$$ <br />$$$$ <br />$$$$ <br />$$$$ <br />$$$$ <br />$$$s <br />$$$D <br />$$$$ <br />$$$$ <br />$$$$ <br />$$$$ <br />$$$$ <br />$$$$ <br />Labor Subtotal $ 1.461.68 <br />$$$$ <br />$$$$ <br />$$$$ <br />Subtotal Cost of Work 211t2017 $ 1,46'1.68 $ 1,0E2.99 $$ 2,5M.67