Laserfiche WebLink
COPW Rates <br />Project Name: Ellensburg Rodeo Arena lmprov <br />Project No: ERAI <br />Contractor:McGenn Electric <br />NOTES: . Rate schedule date is the date of the Dept. of Labor & lndustries Prevailing Wage Rate used or the Union Agreement. <br />a. for items 3 thru 5, the Federal rates do not vary by firm, and the percentages are already locked into this form. <br />b.foritem6,iheactual rateisdeterminedbytheStateEmploymentSecurityDept.andvariesbyfirm. ltshall beverifiedbythecontractorattheslartoftheproiect. <br />c. for item 7, the rate is based on L & I classification. The hourly dollar amount is specific to the firm/trade and shall be verified by the contractor at the start of the project. <br />d. definitions <br />f . items 1 & 2 are basic wages and benefits (see general conditions 7 .OZ B'7 'a(1)) <br />2. item 3, FUI is Federal Unemployment Tax Act (see general conditions 7.02 8.7.a(3)) <br />3. item 4, FICA is Federal lnsurance Compensation Acvsocial Security (see general conditions 7.028.7(3)) <br />4. item 5, Medicare is FICA medical aid (see general conditions 7 .o2 8.7 .a(3\) <br />5. item 6, SUI is State Unemployment Compensation Act (see general conditions 7.02 8.7.a(3)) <br />6. item 7, WC is industrial insurance/workers' compensation (see general conditions 7.02 8.7.a(21) <br />7. item 8, AD is additional compensation for education, dental, vision, entertainment, vehicles <br />Trade & <br />Position <br />ELECTRICIAN <br />JOURNEYMAN <br />ELECTRICIAN <br />FOREMAN <br />ELECTRICIAN <br />SUPERINTENOENT <br />Rate Schedule Date*10t25t25 10125125 10125125 <br />3 88.34 J 97.17 3 106.00 <br />1. Hourlv Waoe Rate s 88.34 $ 97.17 $'106.00 <br />SIIETOTAL $ 88.34 t 97 -'17 s 106.00 s $$s $$3 <br />Rate <br />3 FlJl o/o of 1 0.80%o.71 $0.78 $0.85 $$$$$$$ <br />4 FICA o/o ol 1 6.20%$5.48 $6.02 $6.57 $$$$$$$ <br />o/o of 1 'l AEo/"$'1.28 $1.41 a 1.54 $$$s $$$ <br />6- Sl-Jl % of 1 (insert correct % to riqhl)4.80o/o $4.24 $4.66 $5.09 $$$$$$$ <br />7. WC (insert $ amount per hour)a.95o/n $1.80 $1.85 $'1.90 <br />8.lRA retirement So/o $4.63 $4.75 $5.09 <br />9. WPFM leave 0.50%$0.47 $0.49 $0.51 <br />ToTAL aincl- D.vroll taxesl $ 106.95 s 117.14 s 127.55 $t g $$$$