My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_JUB TO_Taxilane Complex Phase I
>
Meetings
>
2025
>
09. September
>
2025-09-16 10:00 AM - Commissioners' Agenda
>
Resolution_JUB TO_Taxilane Complex Phase I
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2025 12:16:41 PM
Creation date
9/11/2025 12:14:01 PM
Metadata
Fields
Template:
Meeting
Date
9/16/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution Authorizing the Chair's Signature on Task Order 2025-01 with J-U-B Engineering to Perform Engineering Services for the Bowers Field Hangar Taxilane Complex - Phase 1 Design
Order
10
Placement
Consent Agenda
Row ID
135628
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK ORDER 2025-01 <br />HANGAR TAXILANE COMPLEX PHASE 1 DESIGN <br />AI P-3-53-0026-024-2025 <br />4. Analyze the geotechnical testing data to determine the most cost-effective form <br />of new construction. Analyze the performance and stability of existing asphalt <br />section. Rehabilitation methods may include full depth reconstruction in <br />designated select locations, pavement removal and replacement, or pavement <br />overlay depending on test results. Hold a meeting with the CLIENT and FAA at the <br />Airport to present findings of the Geotechnical Testing and analysis of existing <br />pavement. Determine rehabilitation/reconstruction method best suited for the <br />pavement surfaces. <br />5. Define critical aircraft for the pavement design of the project and develop <br />pavement design section. Pavement design criteria shall be in accordance with the <br />FAA Advisory Circular (AC) 150/5320-6G. This will include calculating and reporting <br />the Airport Pavement Strength- PCR. <br />6. Perform analysis of existing geometric layout of Taxiway/Runway fillets and radii <br />to determine compliance with current FAA AC requirements. Present findings to <br />CLIENT and FAA for review and comments. <br />7. Review existing storm water drainage within the project boundary. Evaluate <br />existing drainage patterns and systems. J-U-B shall conduct a required analysis for <br />the design of drainage improvements associated with the project in accordance <br />with the FAA AC 150/S320-5D, Surface Drainage Design. Any necessary drainage <br />improvements will be sized to accommodate local drainage standards. This <br />drainage effort is intended to integrate with previously established drainage <br />designs (specifically the Parallel Taxiway). <br />8. Address subsurface drainage requirements for the runway and determine <br />appropriate methods for compliance with the FAA Northwest Mountain Region <br />policy on subsurface pavement drainage and edge underdrains. Location of <br />underdrain outlets will be a significant portion of this study. <br />9. Perform analysis of existing Runway and Taxiway Shoulders, Safety Area and Object <br />Free Area grading adjacent to project area to determine proposed taxilane <br />compliance with current FAA AC 1 S0/S300-13B requirements. <br />10. Determine the operational and phasing effects of closing portions of adjacent <br />apron pavement areas. Closing the runway will impact the airport users, FBO's and <br />transient aircraft during the construction period. Study the effects of the various <br />alternatives including night construction, temporary displaced thresholds, using <br />parallel taxiway as temporary runway, or phased construction. Complete a cost <br />analysis on all alternatives to present to CLIENT. Two meetings at the Airport will <br />be needed to present preliminary alternatives and phasing plan to the CLIENT and <br />stakeholders. <br />11. Prepare and submit a State Environmental Policy Act (SEPA) Environmental <br />Checklist in accordance with Title 15 of Kittitas County Code. Environmental work <br />\\ ub.com\Central\Clients\WA\KittitasCounty\Projects\45-25- <br />022_BowersField_HangarTxln_PhaselDsgn\ProjMgmt\Agreements\Old\TO 2025_01_RevSept202S.docx <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.