TASK ORDER 2025-01 <br />HANGAR TAXILANE COMPLEX PHASE 1 DESIGN <br />AI P-3-53-0026-024-2025 <br />beyond that described will be considered additional work and may require a <br />contract modification. <br />12. Assemble base data and base maps for the project work area from the design <br />survey, previous projects undertaken, and available aerial data. <br />13. Prepare preliminary Design Plans (60% complete) for review and discussion with <br />the CLIENT and FAA. Resubmit to CLIENT and FAA at 90% complete. It is <br />anticipated that the project design will require sixteen (16) plan sheets including: <br />Sheet 1 — Cover <br />Sheet 2 — Construction Layout Plan <br />Sheet 3 — Operation & Safety Plan - Phase 1 <br />Sheet 4 — Operation & Safety Plan - Phase 2 <br />Sheet 5 — Demolition/Modification Plan <br />Sheet 6 — Grading & Drainage Plan - Sheet 1 <br />Sheet 7 — Grading & Drainage Plan — Sheet 2 <br />Sheet 8 — Plan & Profile Taxilane — Sheet 1 <br />Sheet 9 — Plan & Profile Taxilane — Sheet 2 <br />Sheet 10 — Pavement Marking Plan <br />Sheet 11 — Perimeter Fencing Plan <br />Sheet 12 — Pavement Marking Details <br />Sheet 13 — Fencing Details <br />Sheet 14 — Typical Sections <br />Sheet 15 — Civil Details <br />Sheet 16 - Civil Details <br />14. Prepare preliminary Bidding and Construction Contract Documents and Technical <br />Specifications (60% and 90% complete intervals) based on latest version of FAA AC <br />150/5370-10 "Standards for Specifying Construction on Airports" including the <br />current Regional Notice published by the FAA Airports Districts Office. <br />15. Prepare a preliminary Engineer's Opinion of Probable Construction Cost Estimate <br />based on construction cost estimates, phasing into workable portions for <br />constructability, budget, and construction schedule and advise the CLIENT as to <br />budget status. <br />16. Prepare a preliminary Construction Safety and Phasing Plan according to AC <br />150/5370-2G for evaluation by the CLIENT, Airport, FBO, airport users and <br />agencies. An electronic copy will be submitted to the FAA Airport District Office <br />for coordination, review, and approval with other FAA lines of business using the <br />airspace process. <br />17. Prepare the preliminary Engineer's Design Report in conformance with FAA <br />guidelines. The report shall include a Summary of the Project and its specific design <br />issues, Project Schedule, reference to the Construction Safety and Phasing Plan, <br />Modification of Standards, Design Analysis, Pavement Analysis, Geotechnical <br />\\jub.com\Central\CI ients\WA\KittitasCou my\Projects\45-25- <br />022_BowersFie ld_HangarTxln_PhaselDsgn\ProjMgmt\Agreements\Old\TO 2025_01_RevSept2025.docx <br />7 <br />