My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_JUB TO_Taxilane Complex Phase I
>
Meetings
>
2025
>
09. September
>
2025-09-16 10:00 AM - Commissioners' Agenda
>
Resolution_JUB TO_Taxilane Complex Phase I
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2025 12:16:41 PM
Creation date
9/11/2025 12:14:01 PM
Metadata
Fields
Template:
Meeting
Date
9/16/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution Authorizing the Chair's Signature on Task Order 2025-01 with J-U-B Engineering to Perform Engineering Services for the Bowers Field Hangar Taxilane Complex - Phase 1 Design
Order
10
Placement
Consent Agenda
Row ID
135628
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK ORDER 2025-01 <br />HANGAR TAXILANE COMPLEX PHASE 1 DESIGN <br />AI P-3-53-0026-024-2025 <br />The collected data shall be provided on a compact disk to the Engineer with the <br />following information: point number, description, northing, easting, and elevation <br />along with paper copies of any pertinent field notes. No map or drawing will be <br />required. <br />3. Administer design Geotechnical Subconsultant contract and coordinate delivery of <br />work product. Provide quality control review of work products. This will include <br />one (1) on -site meeting with geotechnical Subconsultant to review project location <br />and safety. The geotechnical laboratory work will be performed utilizing the <br />services of a Subconsultant. The general scope of the geotechnical work will be <br />the following: <br />Administer three (3) cores/bore logs on the proposed taxilane alignment to a depth <br />of 6-feet or refusal. <br />The geotechnical engineer shall immediately patch all pavement core holes with <br />an approved asphalt cold mix or similar product. Data shall be collected on the <br />soil type, existing asphalt condition, and depths and categorized according to the <br />Unified Soil Classification System (USCS) including Moisture Content, Atterberg <br />Limits, Grain Size Distribution. A sieve analysis shall be performed on both the <br />base course and subbase for each core/bore location. The sieve analysis for base <br />course should include the following classifications: percentage by weight passing <br />sieves of 1-inch, 3/4-inch, No. 4, No. 40, No. 200, and 0.02 mm. The sieve analysis <br />for subbase course should include the following classifications: percentage by <br />weight passing sieves of 3-inch, No. 10, No. 40, No. 200, and 0.02 mm. Ground <br />water depth shall be recorded if encountered. Three California Bearing Ratio (CBR) <br />test shall be performed on the bore log samples at a depth of 24-inches which is <br />the anticipated depth of subgrade. <br />The geotechnical engineer shall coordinate with the Engineer to determine exact <br />core/bore log locations. The geotechnical work shall be conducted in accordance <br />to FAA AC 150/5370-2G safety guidelines. The geotechnical engineer shall be <br />responsible for a utility locate prior to work. It should be anticipated that the <br />cores/bore logs shall be taken during nighttime hours. The geotechnical firm will <br />need to coordinate with the Airport Manager and the Engineer personal for closure <br />time and date. <br />The geotechnical firm shall submit 3 copies of the final geotechnical report <br />including all required information as mentioned above to the Engineer within three <br />weeks upon finishing field work. The firm shall submit a draft copy for review prior <br />to finalizing the report and its findings. <br />This line item shall include the coordination and contracting with Subconsultant. <br />The Subconsultant fees shall be addressed in the Expenses-Subconsultant Section. <br />\\jub.com\Central\Clients\WA\KittitasCou my\Projects\45-25- <br />022_BowersFie ld_H angarTxln_PhaselDsgn\ProjMgmt\Agreements\Old\TO 2025_01_RevSept2025.docx <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.