Laserfiche WebLink
With al.t of these etements in ptace, the Etl,ensburg Rodeo Grandstands project is <br />exceptionalty wett-positioned for timel,y and successfut execution' The combination of <br />advanced ptanning, secured funding, regutatory preparedness, and a skitted project team <br />sets the stage for compl.etion in time for the 2026 rodeo season, whiLe stil't attowing the <br />venue to host pre-season events in the summer. This forward-thinking approach <br />underscores the commitment to revital,izing a key community asset and preserving the <br />Legacy of one of the nation's most respected rodeos. <br />2. Risk Management <br />White the project is carefutly ptanned, there are potentiaL risks and challenges that could <br />impact its timeline and success. The primary risk is compteting construction in time for the <br />next Ettensburg Rodeo and Kittitas County Fair. <br />Bisk-C-qns-tfl ratlon-Dslay-s <br />The project is estimated to take 9-10 months based on consuttations with architects <br />and engineers experienced in stadium construction. However, unforeseen chatlenges <br />such as suppl.y chain issues, tabor shortages, or weather conditions coutd extend the <br />timel.ine. <br />Mitigation strategy: To minimize delays, we wiLt work with experienced contractors who <br />have a proven track record of meeting tight deadtines. We witt atso implement a phased <br />construction approach to ensure that criticat components, such as seating and <br />infrastructu re, are Prioritized. <br />Risk;limitedP-r-e:Rqd,e-o-Eventf ime- <br />We aim to futty open at least one month before the rodeo, but any setbacks coutd <br />reduce that timetine. <br />Mitigation Strategy: By maintaining a buffer period in our schedute, we can sti[[ <br />accommodate smatter events and preparation ptans even if minor del.ays occur' <br />Additionatl.y, we witt ensure earl,y procurement of materiats and permits to prevent <br />ad ministrative detays. <br />Risk3rrdgel-QveruLns <br />Cost overruns cou1d occur due to fluctuating material prices or unexpected structural <br />requirements.