My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2025-141
>
Meetings
>
2025
>
08. August
>
2025-08-05 10:00 AM - Commissioners' Agenda
>
Resolution 2025-141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 9:12:40 AM
Creation date
8/21/2025 9:11:08 AM
Metadata
Fields
Template:
Meeting
Date
8/5/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution Adopting the Kittitas County Tourism Infrastructure Project Applications
Order
1
Placement
Board Discussion and Decision
Row ID
133789
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V. Feasibil,ity and Risk Management <br />1. Feasibitity <br />The feasibitity of the Etl.ensburg Rodeo Grandstands project is strongly supported by a <br />foundation of thorough ptanning, professionaI expertise, and secured funding, al't of which <br />contribute to a high tevel of confidence in the project's successfut and timety comptetion. <br />This mutti-faceted approach ensures that the grandstands redevetopment can move <br />forward efficientty, with minimaL risk of delays or budgetary shortfatts. <br />Comprehensive studies and ptanning efforts have ptayed a criticat role in Laying the <br />groundwork for success. Architecturat and engineering assessments have confirmed that <br />the proposed construction timeline of 9 to 10 months is both reatistic and achievabte. The <br />design team has integrated efficient construction techniques and scheduting strategies <br />that aim to minimize disruption to surrounding activities white maximizing productivity. This <br />tevet of planning hetps ensure that each phase of the project proceeds smoothty and on <br />schedute. <br />Financial. readiness is another key factor in the project's feasibitity. The grandstand <br />redevetopment is supported by a soLid mix of committed funding sources, inctuding state <br />grants, contributions from locat partners, and revenue generated by the Ettensburg Rodeo <br />and other events. This financiat backing ensures that the project can proceed without the <br />risk of unexpected funding gaps, attowing work to progress without interruption. <br />Regutatory comptiance has al.so been carefutly considered throughout the pl'anning <br />process. Permitting requirements and environmentaI assessments have been addressed in <br />advance, significantty reducing the risk of administrative detays once construction begins. <br />By incorporating these critical, steps earty in the process, the project team has created a <br />streamtined path forward, avoiding common bureaucratic hurdLes that can stow down <br />targe-scate devetoPments. <br />The team behind the project further strengthens its feasibitity. The invotvement of <br />experienced architects, engineers, and contractors-each with a proven track record of <br />detivering successfuI stadium and Large-venue projects-provides assurance that the work <br />witt meet high standards of quaLity, safety, and efficiency. Their cotlective expertise <br />enhances the project's overatl credibitity and reduces the Likel.ihood of comptications <br />during construction. <br />ln addition, the project is construction-ready. Prel,iminary site preparation and strategic <br />procurement of materiats are atready underway to prevent suppty chain disruptions and <br />support a seamless building process. These proactive steps ensure that once ground is <br />broken, the project can move forward without unnecessary detays.
The URL can be used to link to this page
Your browser does not support the video tag.