My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026 - 2031 Six-Year Capital Improvement Plan - Final
>
Meetings
>
2025
>
08. August
>
2025-08-05 2:00 PM - 2:00pm Public Hearing
>
2026 - 2031 Six-Year Capital Improvement Plan - Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2025 12:05:55 PM
Creation date
7/31/2025 12:04:38 PM
Metadata
Fields
Template:
Meeting
Date
8/5/2025
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Public Hearing to Consider Approval of Updates to the 2026-2031 Capital Improvement Plan
Order
2
Placement
2:00pm Public Hearing
Row ID
133794
Type
Hold Public Hearing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2026-2031 Summary Page 6 <br /> <br /> <br />Reecer Creek through the new <br />structure. <br />Snoqualmie Pass <br />Comprehensive <br />Safety Plan <br />Snoqualmie Pass is a <br />recreational destination and key <br />transportation corridor <br />spanning two counties. Kittitas <br />County is working with King <br />County, WSDOT, and area <br />stakeholders to increase the <br />safety for outdoor enthusiasts <br />and area businesses. The <br />Comprehensive Safety Plan <br />will address safety concerns <br />and increased usage of the Pass, <br />taking a proactive approach to <br />minimize risks to public safety. <br />Safe Streets for <br />All (SS4A), <br />local funds <br />2025-2027 $504,000 <br />Huntzinger Rd Safety <br />Improvements – <br />Phase 1 <br />Huntzinger Road has several <br />areas with steep embankments <br />and no shoulders. The work <br />will include installing guardrail, <br />placing signage and additional <br />delineation to improve travelers <br />safety. <br />Highway Safety <br />Improvement <br />Program (HSIP) <br />2025 $1,581,000 <br />Horizontal Curve <br />Safety Project <br />Kittitas County Road Safety <br />Improvement Plan 2023 <br />(Resolution 2023-047) was <br />created to reduce collisions and <br />improve safety within the <br />County Road network. <br />Horizontal curves have been <br />identified as high risk by data <br />collected for the 2023 Safety <br />Plan. The proposed project is to <br />identify, plan, design, and <br />implement measures for crash <br />prevention. The project <br />includes adding advisory <br />speeds, LED chevrons, and <br />additional carsonite safety posts <br />to reduce crashes on the road <br />system. <br />Highway Safety <br />Improvement <br />Program (HSIP) <br />2025-2026 $375,000 <br />Yellowstone Culvert <br />Replacement <br />The Yellowstone Road culvert <br />project will replace the existing <br />undersized and deteriorating <br />culvert with a larger culvert that <br />has the capacity to handle high <br />water flow and sediment in the <br />stream. The culvert replacement <br />will prevent the washout of the <br />county road as well as improve <br />fish passage. <br />Surface <br />Transportation <br />Block Grant <br />(STBG), local <br />funds <br />2026-2027 $1,755,000
The URL can be used to link to this page
Your browser does not support the video tag.