My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ellensburg Fieldhouse Project (003)
>
Meetings
>
2025
>
08. August
>
2025-08-05 10:00 AM - Commissioners' Agenda
>
Ellensburg Fieldhouse Project (003)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2025 12:12:47 PM
Creation date
7/31/2025 12:04:10 PM
Metadata
Fields
Template:
Meeting
Date
8/5/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution Adopting the Kittitas County Tourism Infrastructure Project Applications
Order
1
Placement
Board Discussion and Decision
Row ID
133789
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B *KING <br />�k & ASSOCIATES LTD <br />Recreation Planning and Operations Consultants <br />outweighs the faculty and staff bringing the figure down. This reality means that <br />determining an accurate price point for membership, programs and services will be <br />crucial. It also means that the facility could have challenges achieving the cost recovery <br />goals of the client. <br />Median Age: for purposes of a feasibility study, the preference is for median age to be <br />lower than the national number, indicating the presence of families with young children. <br />The median age is lower than both the State and National figure in the Primary and <br />Secondary Service Area. However, in the Primary Service Area in the study there are <br />less than 30.0% of households with children present, which is less than the National <br />figure. Again, much of this can be attributed to the presence of Central Washington <br />University. <br />Other important demographic notes: <br />• Within the Primary Service Area, 18.0% of the population is under age 18, and <br />28.5% of the population is age 55+. There is a significant population in the 18-24 <br />age group, however this demographic typically takes greater advantage of the <br />university facilities. <br />• The Market Potential Index (MPI) for adults that participate in many indoor <br />activities is higher than the national number including Basketball, Football, <br />Pickleball, Soccer and Volleyball in the Primary Service Area. Participation rates <br />in the Secondary Service Area are lower. <br />Statistics from the National Sporting Goods Association (NSGA) were overlaid on to the <br />demographic profile of the service areas to determine the market potential for various <br />activities that could take place in an indoor facility. The market potential was measured <br />against the existing inventory of recreation providers in the area and concluded that there <br />is a significant shortage of gymnasium space. Additionally, there is a desire to expand <br />the capabilities of hosting tournaments and other indoor activities. Existing facilities <br />continue to age and do not completely meet the needs of the parks and recreation <br />department. <br />Current youth sports activities, particularly indoor sports of basketball, wrestling and <br />volleyball, are at capacity based on use of existing facilities. The City of Ellensburg has <br />an interlocal agreement with the school district allowing access to school gyms. While <br />this arrangement works well, there are consistent scheduling conflicts causing <br />cancellations and rescheduling. The City spends a considerable amount of time <br />coordinating use which would be eliminated with its own facility. In addition, it would <br />provide the community with the opportunity to have greater access, drop -in play, and be <br />more active during the winter months. <br />Operations: <br />An operation analysis was conducted to examine operational costs and revenues for the <br />various concepts for the fieldhouse. The operating pro -forma developed represents a <br />3 1 Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.