My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-03-11-minutes-solid-waste-and-maintenance
>
Meetings
>
2025
>
04. April
>
2025-04-15 10:00 AM - Commissioners' Agenda
>
2025-03-11-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 12:36:45 PM
Creation date
4/10/2025 12:15:43 PM
Metadata
Fields
Template:
Meeting
Date
4/15/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
129782
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring Well BS Plans and Specifications <br />1#iStitas County Solid waste <br />1.4.3.2 Itriplementation Requirements <br />In the event that hazardous material is encountered during the course of the Work, regardless of <br />whether or not the material is shown in the Plans, the implementation of the CONTRACTOR'S SPCCP <br />shall be included in the scope of the Work and shall be carried out by the CONTRACTOR. <br />The CONTRACTOR shall maintain, at the job site, the applicable equipment and material designated <br />in the SPCCP. <br />1.4.4 Notice Of Intent / One Call Utility Notification <br />The CONTRACTOR shall provide verification of the notice of intent submitted to Ecology in <br />accordance with WAC 173-160-420 and to the GEOLOGIST prior to commencement of work . The <br />Notice of Intent to construct a well must be submitted 72 hours in advance of work as noted in <br />Section 2.2.1. A one -call utility notification shall be submitted by the CONTRACTOR at least 48-hours <br />prior to start of drilling. <br />The following may be utilized for the notice of intent and one -call utility notification: <br />The location of the well is staked with a wooden post that is painted white. <br />■ Site Address: 25900 Vantage Highway in Ellensburg, Kittitas County, Washington <br />■ Mailing Address: 925 Industrial Way Ellensburg WA 98926 <br />■ Well Location Coordinates: 46.968107-120.214629 <br />■ Township, Range, Section, Qtr/Qtr: The NW quarter of the NW quarter within Section 16, T 17 <br />North R 21 East <br />s Parcel Number: Kittitas County 040833 <br />■ Owner: Kittitas County Solid Waste <br />■ Owner Representative. Patti Stacey 509.962.7070 <br />■ Site Contact: Brandon Metrevell I Oran clon_rtletreveli@co.kittitas.V�.Ws 1 509.737.7623 <br />:1.5 Post -Work Submittals <br />Within 30 days following construction of the well, the CONTRACTOR shall submit a copy of the notice <br />of well construction filed with Ecology to the GEOLOGIST. The CONTRACTOR shall complete the report <br />in accordance with WAC 173-160 without reliance on data recorded by the GEOLOGIST. <br />1.5 Miscellaneous <br />There is no water supply available at the Facility. The Facility is supplied water by a water truck. <br />Portable restrooms are available at the Facility for use of the CONTRACTOR for the duration of the <br />project. <br />The Professional Services Agreement In Appendix B has additional contracting conditions for this <br />wor k. <br />February2025 1 553-1763-010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.