My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-03-24-minutes-ec-study-session
>
Meetings
>
2025
>
04. April
>
2025-04-15 10:00 AM - Commissioners' Agenda
>
2025-03-24-minutes-ec-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 12:22:16 PM
Creation date
4/10/2025 12:15:43 PM
Metadata
Fields
Template:
Meeting
Date
4/15/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
129782
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCJ ALLIANCE <br />CONSULTING SERVICES <br />2) Cost Estimate <br />♦ 7S% Estimate of quantities and unit costs <br />♦ 100% Estimate of quantities and unit costs <br />♦ Bid Proposal Sheet Development <br />3) Specifications <br />♦ Formatted to APWA and WSDOT Standard Specifications <br />♦ Front End Contracting documents are to be provided by the County <br />4) Review Meetings <br />♦ County Meeting for Progress and incremental reviews —Assume 4 <br />♦ City Meetings for Permitting Purposes —Assume 2 <br />♦ City Meeting for Electrical / Plan Coordination — 2 <br />Amendment 6 <br />March 18, 2025 <br />Page 3 of 7 <br />5) Permitting <br />♦ Meeting with the City on the initial project execution approach to the Undergrounding <br />Project. <br />♦ SCJ will fill out a permit application for land disturbance of the undergrounding project. <br />♦ SCJ will fill out a right-of-way use permit for the purposes of the project performing traffic <br />control. <br />♦ SCJ assumes that the City will not require SEPA for this standalone underground project. If <br />other applications are required, they will be added to this task on a time and material basis. <br />6) Small Works Bid Advertisement Support <br />♦ Bid Advertisement: SCJ will prepare a narrative bid advertisement for the Contractor to <br />understand the bid procedures. <br />♦ Respond to Bidders: We have estimated 4 hours of our time to respond to bidders' <br />questions and clarifications. <br />♦ Addendum: We have estimated 4 hours for creating and publishing an addendum if it is <br />necessary. <br />♦ Bid Opening: SCJ will assist the County with the formal opening and announcement of the <br />bid opening. SCJ will then create a bid tabulation to compare bid totals and unit costs. We <br />review the bid proposal to make sure they are complete and meet the bidding criteria. <br />♦ Bid Award: SCJ will develop a Recommendation of Award to the County to provide to their <br />board for determination to award the contract to the bidder. <br />♦ Contract Execution: SCJ can assist with the coordination of the construction contract <br />documents and the Notice To Proceed notification to the Contractor. <br />25 N Wenatchee Ave, Suite 238 • Wenatchee, WA 98801 • Office 509 886 3265 • Fax 360 352,1509 • scjalliance com <br />
The URL can be used to link to this page
Your browser does not support the video tag.