My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-03-24-minutes-ec-study-session
>
Meetings
>
2025
>
04. April
>
2025-04-15 10:00 AM - Commissioners' Agenda
>
2025-03-24-minutes-ec-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 12:22:16 PM
Creation date
4/10/2025 12:15:43 PM
Metadata
Fields
Template:
Meeting
Date
4/15/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
129782
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Amendment 6 <br />SCJ ALLIANCE March 18, 2025 <br />CONSULTING SERVICES Page 2 of 7 <br />Task 3 Undergrounding Electrical Project Design <br />This task is to develop a Small Works Roster project in coordination with the City of Ellensburg (City) to <br />underground the electrical on the proposed RV park and remove the existing overhead infrastructure. The short <br />project will include a small public bid process for the Work that the County is responsible for and the integration <br />of the portion of work that the City will be performing: <br />SEC 36 TIE N,R ISE,WM <br />.7' I <br />ff -- -- <br />1) Construction Plans <br />♦ 75% Design Level Construction Plans <br />(a) Cover Sheet <br />(b) Existing Conditions <br />(c) Conduit Plan <br />(d) Standard Details <br />(e) Restoration Plan <br />(f) Restoration Details <br />(g) Traffic Control Plan <br />♦ 100% Construction Plans <br />(a) Updates to the overall plan set after a 75% design coordination meeting with the <br />County/City. <br />(b) This assumes there are no changes to the current layout or approach to the scope of <br />the project as defined as of the date of this amendment. <br />♦ Final Review with City for Bid Approval <br />♦ General QA/QC during this plan development. <br />25 N Wenatchee Ave, Suite 238 0 Wenatchee, WA 98801 0 Office 509.886.3265 • Fax 360 352 1509 • scjalliance corn <br />
The URL can be used to link to this page
Your browser does not support the video tag.