My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COP09 Concrete Changes
>
Meetings
>
2025
>
04. April
>
2025-04-01 10:00 AM - Commissioners' Agenda
>
COP09 Concrete Changes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 12:05:33 PM
Creation date
3/27/2025 12:05:14 PM
Metadata
Fields
Template:
Meeting
Date
4/1/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Change Order No. 5 for the Lower County Transfer Station
Order
11
Placement
Consent Agenda
Row ID
129428
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N u C ® ,,, ® <br />Harris Rebar Columbia Basin Inc. Change Order No.: <br />HARRIS REBAR <br />CO-002 <br />CHANGE <br />ORDER <br />Bid Item No.: <br />Job No.: <br />Job Description: <br />Original CIO Daie: <br />Revised CIO Date: <br />CO-002 <br />16514688 <br />Lower Valley Transfer Station <br />12/06/24 <br />Sell To: B10298 <br />Belsaas & Smith Construction, Inc. <br />P.O. Box 926 <br />Ellensburg, WA 98926-9026 <br />USA <br />Change Order Description: <br />Transfer Building Revisions <br />Description Type quantity Unit Price Line Amount <br />Transfer Building Revisions F&I Add 1 LS $11,399.89 $11,399.89 <br />Added Retaining Wall F&I Add 1 LS $12,193.14 $12,193.14 <br />F&I PER TRANSFER BLDG REVISED DRAWINGS <br />F&I TRANSFER BLDG RETAINING WALL <br />Per Revised Contract Dwgs (dt. 11-4-2024) <br />PerS-SK-01 (dt. 11 -7-2024) <br />Added retaining walls on north & south side of tunnel <br />Added 59 LF north of tunnel & 53.5 LF south of tunnel <br />Per Contract Conditions & Exclusions <br />Total: $23,593.03 <br />Addition To Contract <br />Issued By: Benjamin Davis <br />Accepted By: Name: <br />Date: <br />(Please PtlM) <br />(Signature) <br />Harris Rebar Columbia Basin Inc. <br />PO BOX 575, Burbank, WA 99323, USA T. 509-547-2471 F. 509-547-1856 <br />Customer Copy <br />
The URL can be used to link to this page
Your browser does not support the video tag.