My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COP09 Concrete Changes
>
Meetings
>
2025
>
04. April
>
2025-04-01 10:00 AM - Commissioners' Agenda
>
COP09 Concrete Changes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 12:05:33 PM
Creation date
3/27/2025 12:05:14 PM
Metadata
Fields
Template:
Meeting
Date
4/1/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Change Order No. 5 for the Lower County Transfer Station
Order
11
Placement
Consent Agenda
Row ID
129428
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Transfer Station Concrete <br />Changes <br />._ <br />Description <br />Old <br />New <br />Difference <br />Outside Tunnel Footings <br />$ 72,920.00 <br />$ <br />73,080.00 <br />$ <br />160.00 <br />Inside Tunnel Footings <br />$ 75,800.00 <br />$ <br />83,090.00 <br />$ <br />7,290.00 <br />Stair Footing <br />$ 23,400.00 <br />$ <br />- <br />$ <br />(23,400.00) <br />Outside Tunnel Wall <br />$ 169,520.00 <br />$ <br />88,840.00 <br />$ <br />(80,680.00) <br />Tunnel Walt to Bottom of Stab <br />$ 114,860.00 <br />$ 146,010.00 <br />$ <br />31,150.00 <br />Stairway <br />$ 15,250.00 <br />$ <br />15,250.00 <br />$ <br />- <br />Pushwall <br />$ 80,200.00 <br />$ 119,300.00 <br />$ <br />39,100.00 <br />Piers increase height <br />$ 24,000.00 <br />$ <br />30,380.00 <br />$ <br />6,380.00 <br />Bollards 10 EA <br />$ - <br />$ <br />9,000.00 <br />$ <br />9,000.00 <br />Retaining Walt Footings <br />$ - <br />$ <br />63,700.00 <br />$ <br />63,700.00 <br />Apped Exterior 4' Wall <br />$ - <br />$ <br />35,380.00 <br />$ <br />35,380.00 <br />Exterior Retention Walls <br />$ - <br />$ <br />91,040.00 <br />$ <br />91,040.00 <br />Added Cold Weather Protection <br />$ <br />17,600.00 <br />$ <br />17,600.00 <br />Concrete Sidewal Added Patti <br />$ <br />816.00 <br />$ <br />816.00 <br />Tunnel Slab <br />No Change in Cost <br />Exterior Concrete Curb <br />$ <br />$ <br />21,220.00 <br />$ <br />21,220.00 <br />Additional Rebar <br />$ <br />25,576.00 <br />$ <br />25,576.00 <br />Subtotal <br />$ <br />244,332.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.