Laserfiche WebLink
r4LJ C ®R® <br />HARRIS REBAR <br />Harris Rebar Columbia Basin Inc. Change Order No.: <br />CO-001 <br />CHANGE <br />ORDER <br />Bid Item No.: <br />Job No.: <br />Job Description: <br />Original C/O Date: <br />[Revised C/O Date: <br />CO-001 <br />16514688 <br />Lower Valley Transfer Station <br />11/19/24 <br />Sell To: B10298 <br />Belsaas & Smith Construction, Inc. <br />P.O. Box 926 <br />Ellensburg, WA 98926-9026 <br />USA <br />Change Order Description: <br />Add'I Reinf'g for PEMB Reactions <br />PerS-SK-01 (dt.11-7-24) <br />Description Type <br />Ouantity Unit Price Line Amount <br />Furnish & Install Additional Reinf'g Add <br />1 LS $871.31 $871.31 <br />Freight Add <br />1 LS $1,112.00 $1,112.00 <br />FURNISH & INSTALL ADD'L REINF'G FOR PEMB REACTIONS <br />Added Reinforcing for the MRW Building <br />Added (2)-#7 Slab Dowels per Column (12 columns total) <br />Per Contract Conditions & Exclusions <br />PerS-SK-01 (dt. 11 -7-2024) <br />Total: $1,983.31 <br />Addition To Contract <br />Issued By: Benjamin Davis <br />Accepted By: Name: <br />Date: <br />(Please MI) <br />(slgmture) <br />Harris Reber Columbia Basin Inc. <br />PO BOX 575, Burbank, WA 99323, USA T. 509-547-2471 F. 509-547-1856 Customer Copy <br />