Laserfiche WebLink
7.4 Obtain approval of all governmental authorities for the PROJECT, and approvals and <br />consents from other individuals as necessary for completion of the PROJECT. This <br />PROJECT is a distribution system improvement and does not require independent <br />Washington State Department of Health (DOH) review and approval, as a result of having <br />design and construction standards as part of the TOVVN's DOH -approved Water System <br />Plan. <br />7.5 Pay for advertising, notices, or other publications as may be required. <br />7.6 Pay for all necessary permits and testing fees not paid by the Contractor. <br />TWE OF PERFORMANCE: <br />HLA will diligently pursue the completion of the PROJECT as follows: <br />1.0 ProIW imnago nt gnd Administration <br />Work described in Item 1.0 Project Management and Administration within the Scope of Services above <br />shag begin upon contract execution and extend throughout the duration of the PROJECT. <br />2.0 Environmental Assistance <br />Work described in Item 2.0 Environmental Assistance within the Scope of Services above shall begin <br />upon contract execution and extend throughout the duration of the PROJECT. <br />3.0 Preffminary EnaineeHna Design 130%) <br />Work described in Item 3.0 Preliminary Engineering Design (30%) within the Scope of Services above <br />shall begin upon contract execution and be completed within ninety (90) working days. <br />4.0 Fthai Design. Plans, and Specifications (ft0%. %, and Jbill <br />VOA described in Item 4.0 Final Design, Plans, and Specifications (60%, 90%, and Final) within the <br />Scope of Services afore shall begin upon completion of Item 3.0 and be completed as follows: <br />4.1 60% Submittal - Sixty (60) working days from receipt of TOWN review comments on 30% <br />submittal. <br />4.2 9016 Submittal - Thirty (30) working days from receipt of TOWN review comments on 60% <br />submittal. <br />4.3 Firml PS$E - Thirty (30) working days from receipt of TOWN review comments on 90% <br />submittal. <br />S.0 (3iddiII9.Swk-ea- <br />Work described in Item 5.0 Bidding Services within the Scope of Services above shall begin upon TOWN <br />approval of &W submittal package and be completed upon recommendation of award. <br />Time for completion of work directed by the TOWN under additional services shall be negotiated and <br />Mutually agreed upon at the time service is requested by the TOWN. <br />FEE FOR SERVICES: <br />For the services furnished by HLA as described within this Task Order, the TOWN agrees to pay HLA the <br />fees as set forth herein. The amounts listed below may be revised only by written agreernent of both <br />parts. <br />&ACo+9racls 3 Talk OtdenlSotM Cie E1tan=251TownvA1e water Main ReptaoemenaMS-0ti-16 26038E Task order No. 202"1 Towmwide Weter <br />imam PA09w1wittim Page 5 of 6 <br />