Laserfiche WebLink
1.0 Project Management and Administration <br />Work described in Item 1.0 Project Management and Administration within the Scope of Services above <br />shall be performed for the lump sum fee of $87,000. <br />2.0 Environmental Assistance <br />Work described in Item 2.0 Environmental Assistance within the Scope of Services above shall be <br />performed for the lump sum fee of $17,000. <br />3.0 Preliminary Engineering) Design (30%) <br />Work described in Item 3.0 Preliminary Engineering Design (30%) within the Scope of Services above <br />shall be performed for the lump sum fee of $334,000. <br />4.0 Final Design Plans and SpecHications tOY 20%and Fla!) <br />Work described in Item 4.0 Final Design, Plans, and Specifications (60%, 90%, and Final) within the <br />Scope of Services above shall be performed for the lump sum fee of $356,000. <br />5.0 . Bidding Services <br />Work described in Item 5.0 Bidding Services within the Scope of Services above shall be performed for <br />the lump sum fee of $11,000. <br />6.0 Additional Services <br />Additional work requested by the TOWN not included in this Task Order shall be authorized by the TOWN <br />and agreed upon by H.A in writing prior to proceeding with services. HtA will perform additional services <br />as directed/authorized by the TOWN on a tires; -spent basis at the hourly billing rates included in our <br />General Agreement, plus reimbursement for direct non -salary expenses such as vehicle mileage, out-of- <br />town meals/lodging, advertising, and printing expenses. Outside subconsultant s invoices shall be marked <br />up by a factor of 1.10 times the subconsultant invoice. <br />Proposed: <br />Ht.A Engineering and <br />Michael T. Satde, PE, President <br />Approved: <br />of South Cle Elu <br />i DeVere, Mayor <br />Dst <br />G iCordracts & Task OrderslSouth Cle EW12026ftwnwbe Water UsM Replaomner02025.01-4 25039E Task Order No. 2025.01 TowrwAde water <br />Main Repiecement.dow Page 6 of 6 <br />