Laserfiche WebLink
BELSAAS & SMITH CONSTRUCTION <br />SHEET 2 of 2 C.O.P. #8 <br />CHANGE ORDER PROPOSAL BREAKDOWN SHEET <br />EQUIP SUB MATERIAL LABOR <br />COST COST COST COST <br />TOTALS FROM PREVIOUS PAGE 0 (10,000.00)0 0 <br />SUB TOTAL 0 (10,000.00)0 0 <br />SUB TOTAL 0 (10,000.00)0 0 <br />LABOR 0 <br />MATERIAL 0 <br />EQUIPMENT 0 <br />SUBCONTRACTORS (10,000.00) <br />SUB TOTAL SUB TOTAL (10,000.00) <br />GRAND TOTAL TOTAL (10,000.00) <br />TIME EXTENTION REQUIRED:0 <br />NOTICE TO PROCEED REQUIRED BY: <br />WE RESERVE OUR RIGHTS UNDER THE CONTRACT TO ACCESS THIS CHANGE <br />CUMULATIVELY AS IT AFFECTS TIME AND AMOUNT.