Laserfiche WebLink
BELSAAS & SMITH CONSTRUCTION <br />SHEET 1 of 2 C.O.P. #8 <br />CHANGE ORDER PROPOSAL BREAKDOWN SHEET <br /> UNIT COSTS EQUIP SUB MATERIAL LABOR <br />#DESCRIPTION QUAN.UNIT Mat.EQUIP LABOR COST COST COST COST <br />Meter Swtich <br />Titan Electrical 1 LS 0.00 (10,000.00)0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />*TOTALS 0 (10,000.00)0 0