My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COP08 Meter Cabinet Credit
>
Meetings
>
2025
>
03. March
>
2025-03-04 10:00 AM - Commissioners' Agenda
>
COP08 Meter Cabinet Credit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2025 12:09:22 PM
Creation date
2/27/2025 12:09:02 PM
Metadata
Fields
Template:
Meeting
Date
3/4/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Change Order No. 3 for the Lower County Transfer Station
Order
6
Placement
Consent Agenda
Row ID
128215
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Titan Electrical LLC <br />PO Box 698 <br />Selah, Washington 98942 <br />Phone: (509) 941-8306 <br />Project: C24-197 - Lower Valley Transfer Station - Kittitas <br />925 Industrial Way <br />Ellensburg, Washington 98926 <br />Prime Contract Potential Change Order #004: Meter Switch Credit <br />TO: Belsaas & Smith Construction Inc. <br />103 E 4th Ave # 209 <br />Ellensburg, Washington 98926 <br />FROM: Titan Electrical LLC <br />215 Keys Rd <br />Yakima, Washington 98901 <br />PCO NUMBER/REVISION: 004 / 0 CONTRACT:1 - Lower Valley Transfer Station <br />REQUEST RECEIVED FROM: CREATED BY: Mike Yusi (Titan Electrical LLC) <br />STATUS: Pending - Proceeding CREATED DATE: 1/23/2025 <br />REFERENCE: PRIME CONTRACT <br />CHANGE ORDER: <br />None <br />FIELD CHANGE: No <br />LOCATION: ACCOUNTING METHOD: Amount Based <br />SCHEDULE IMPACT: PAID IN FULL: No <br />EXECUTED:No SIGNED CHANGE ORDER <br />RECEIVED DATE: <br /> TOTAL AMOUNT: ($10,000.00) <br /> <br />POTENTIAL CHANGE ORDER TITLE: Meter Switch Credit <br /> <br />CHANGE REASON: Allowance <br /> <br />POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) <br />Credit is for the elimination of the redundant service disconnect in the meter section. <br /> <br />Total Credit - $10,000 <br /> <br />ATTACHMENTS: <br /> <br />#Budget Code Description Amount <br />1 $(10,000.00) <br />Grand Total:$(10,000.00) <br /> Belsaas & Smith Construction Inc. Titan Electrical LLC <br /> 103 E 4th Ave # 209 215 Keys Rd <br /> Ellensburg, Washington 98926 Yakima, Washington 98901 <br /> <br /> <br />ProcoreArchitectSignHere ProcoreArchitectSignedDate ProcoreOwnerSignHere ProcoreOwnerSignedDate ProcoreGeneralContractorSignHere ProcoreGeneralContractorSignedDate <br />SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE <br /> <br />Titan Electrical LLC Page 1 of 1 Printed On: 1/23/2025 11:13 AM PST <br /> <br /> <br /> <br />PCO #004
The URL can be used to link to this page
Your browser does not support the video tag.