Laserfiche WebLink
<br /> <br /> <br /> P.O. BOX 926 / 103 EAST 4TH AVE, SUITE 209 <br /> ELLENSBURG, WA 98926 <br /> 509-925-9747 <br /> brandon@belsmith.com <br /> <br /> <br /> <br /> <br /> <br /> <br />January 29, 2025 <br /> <br /> <br /> <br /> <br />Re: Change Order Proposal #08 <br /> <br />Per the description below, we are pleased to offer the following change order proposal #08 <br />(COP#08). <br /> <br />Per RFI #09 Titan noticed that due to the local codes and other electrical gear already needed <br />there was a redundant breaker in the meter cabinet. Per the response given by Ali on 10/25 in <br />the comment section of the RFI 09 there is a credit for the redundant gear. <br /> <br />Total cost to be implemented into the contract: $ -10,000.00 <br /> <br /> <br /> <br />Time extension required: 0 days <br /> <br /> <br /> <br />Sincerely, <br /> <br /> <br />Brandon Drexler, <br />Belsaas & Smith Construction