My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024 Annual Comp Plan Ordinance & Attached Exhibits
>
Meetings
>
2025
>
01. January
>
2025-01-07 10:00 AM - Commissioners' Agenda
>
2024 Annual Comp Plan Ordinance & Attached Exhibits
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2025 12:35:08 PM
Creation date
1/2/2025 12:26:49 PM
Metadata
Fields
Template:
Meeting
Date
1/7/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Ordinance for the 2024 Annual Docket Amendments to the Comprehensive Plan
Order
12
Placement
Consent Agenda
Row ID
125743
Type
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
such that the crushed surfacing is completed in stages, each such stage shall be inspected <br />separately. <br />G. Curb and Sidewalk Forming: <br />1. Required Notice: Two working day notice. Inspection must be complete prior to pouring <br />concrete. <br />2. Inspection Details: To verify proper forming and preparation for concrete in accordance <br />with the approved plans, and these standards. If the scope of the project is such that <br />forming of curb and sidewalk is completed in stages, each such stage shall be inspected <br />separately. <br />H. Curb and Sidewalk Placement: <br />1. Required Notice: Two working day notice. <br />2. Inspection Details: To check placement of concrete in accordance with the approved <br />plans, and these standards. <br />I. Pre -Paving: <br />1. Required Notice: Two working day notice. <br />2. Inspection Details: Prior to paving, to verify that all work to date has been constructed in <br />accordance with the approved plans, and these standards. <br />J. Paving: <br />1. Required Notice: Three working day notice in advance of paving with hot mix asphalt or <br />Portland cement concrete. <br />2. Inspection Details: To verify paving and compaction, or placement of concrete roadway is <br />in accordance with the approved plans, and these standards. <br />K. Structural: <br />1. Required Notice: Three working day notice prior to each of critical stages such as placing <br />foundation piling or footings, placement and assembly of major components, and <br />completion of structure and approaches. <br />2. Inspection Details: Tests and certification requirements will be as directed by the County <br />Engineer. <br />L. Final Inspection: <br />1. Required Notice: Five working day notice. <br />2. Inspection Details: Overall check of project site, to verify completion of paving and <br />associated appurtenances and improvements, traffic control devices, electrical systems, <br />Title 12 Kittitas County Code I Draft No. 5 — Working Draft forAdoption 1011212023 <br />101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.