My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024 Annual Comp Plan Ordinance & Attached Exhibits
>
Meetings
>
2025
>
01. January
>
2025-01-07 10:00 AM - Commissioners' Agenda
>
2024 Annual Comp Plan Ordinance & Attached Exhibits
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2025 12:35:08 PM
Creation date
1/2/2025 12:26:49 PM
Metadata
Fields
Template:
Meeting
Date
1/7/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Ordinance for the 2024 Annual Docket Amendments to the Comprehensive Plan
Order
12
Placement
Consent Agenda
Row ID
125743
Type
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
utility installation, cleaning of drainage system, edge restoration, seeding, planting, and all <br />necessary clean-up in accordance with the approved plans and these standards. <br />Additional Requirements: Prior to final approval of construction work, acceptance for <br />maintenance and release of construction performance bonds, the developer/contractor <br />shall pay any required fees, submit any required maintenance and defect financial <br />guarantees, provide certification of monumentation and submit one set of <br />corrected plans (as -built) reflecting all minor and design plan changes of the roadway and <br />drainage systems. The Department of Public Works shall specify the number of n r-sets <br />as warranted by the type of improvement. Mylars shall not have any shading or adhesive <br />additiGR iR any aFeas. If original plans were completed on a CADD system, the <br />developer/contractor shall submit, in addition to rnylaFs physical plans, a copy of the <br />CADD drawing files in .DWG format. <br />M. Final Maintenance Inspection: <br />1. Required Notice: 30 days prior to the end of the maintenance period. <br />2. Inspection Details: Overall check of work associated with a maintenance guarantee. <br />3. Additional Requirements: Prior to release of the maintenance guarantee, there shall be <br />successful completion of the maintenance period as described KCC 12.01.090, repair of <br />any failed facilities and the payment of any outstanding fees. <br />12.05.02.080 Structure Inspections. <br />The following shall apply to the construction inspection of all bridges and major drainage structures: <br />A. All materials and construction activity, and testing thereof, shall conform to the current edition of <br />the WSDOT Standard Specifications, as amended. <br />B. Prior to construction, the County Engineer shall hold a pre -construction meeting with the <br />applicant's structural engineer to review the required inspections and documentation. <br />C. The applicant's structural engineer shall be responsible for inspection, material testing, quality <br />control, and sufficiency of the completed structure. <br />D. All inspection activities and methods shall be subject to approval by the County Engineer. <br />Inspection and testing shall be conducted at the direction of the applicant's structural engineer as <br />frequently as necessary to ensure the construction conforms to the approved plans and <br />specifications. <br />Title 12 Kittitas County Code I Draft No. 5 — Working Draft forAdoption 1011212023 <br />102 <br />
The URL can be used to link to this page
Your browser does not support the video tag.