Laserfiche WebLink
utility installation, cleaning of drainage system, edge restoration, seeding, planting, and all <br />necessary clean-up in accordance with the approved plans and these standards. <br />Additional Requirements: Prior to final approval of construction work, acceptance for <br />maintenance and release of construction performance bonds, the developer/contractor <br />shall pay any required fees, submit any required maintenance and defect financial <br />guarantees, provide certification of monumentation and submit one set of <br />corrected plans (as -built) reflecting all minor and design plan changes of the roadway and <br />drainage systems. The Department of Public Works shall specify the number of n r-sets <br />as warranted by the type of improvement. Mylars shall not have any shading or adhesive <br />additiGR iR any aFeas. If original plans were completed on a CADD system, the <br />developer/contractor shall submit, in addition to rnylaFs physical plans, a copy of the <br />CADD drawing files in .DWG format. <br />M. Final Maintenance Inspection: <br />1. Required Notice: 30 days prior to the end of the maintenance period. <br />2. Inspection Details: Overall check of work associated with a maintenance guarantee. <br />3. Additional Requirements: Prior to release of the maintenance guarantee, there shall be <br />successful completion of the maintenance period as described KCC 12.01.090, repair of <br />any failed facilities and the payment of any outstanding fees. <br />12.05.02.080 Structure Inspections. <br />The following shall apply to the construction inspection of all bridges and major drainage structures: <br />A. All materials and construction activity, and testing thereof, shall conform to the current edition of <br />the WSDOT Standard Specifications, as amended. <br />B. Prior to construction, the County Engineer shall hold a pre -construction meeting with the <br />applicant's structural engineer to review the required inspections and documentation. <br />C. The applicant's structural engineer shall be responsible for inspection, material testing, quality <br />control, and sufficiency of the completed structure. <br />D. All inspection activities and methods shall be subject to approval by the County Engineer. <br />Inspection and testing shall be conducted at the direction of the applicant's structural engineer as <br />frequently as necessary to ensure the construction conforms to the approved plans and <br />specifications. <br />Title 12 Kittitas County Code I Draft No. 5 — Working Draft forAdoption 1011212023 <br />102 <br />